1.
Study on Dynamic Response Characteristics and Safety Monitoring Indexes of Apron Slabs in Plunge Pool of Ertan Hydropower Station;
二滩水电站水垫塘底板动力响应特性与安全监测指标研究
2.
Research on Characteristics of Hydrodynamic Pressure of Slabs Set in the Ring of Arch Invert Cushion Pool;
反拱水垫塘拱圈底板动水压强变化规律的研究
3.
Research on Regularities of Distribution of the Axial Forces between Slabs Set in the Ring of Arch Invert Plunge Pool;
反拱水垫塘拱圈底板块轴力变化规律的研究
4.
Variation pattern of hydrodynamic pressure on arched ring slabs in arch invert water-cushion pool in time and frequency domain
反拱水垫塘拱圈底板动水压强时域与频域的变化规律
5.
Simulation on Flow Field of Inverted Arch Cushion Pool and Experimental Study on Vibration Characteristics of Slabs;
反拱水垫塘流场数值模拟及其底板块振动特性的试验研究
6.
Comparison of Flow Fields of the Arch Inverted Plunge Cushion Pool with the Flat-bottomed Cushion Pool of Xiluodo Arch Dam by Using 3-D Numerical Simulation
溪洛渡高拱坝反拱水垫塘与平底水垫塘流场的三维数值模拟比较
7.
Influence of water ject aeration on pressure in scour pool and plunge pool
射流掺气对水垫塘及坑底压强影响的实验研究
8.
floor mat with a base of felt paper or paperboard
地垫,以纸或纸板为底
9.
Carbon ramming material is used on the spacer,the bottom of blast furnace and some other parts of the blast furnace.
高炉炉底垫层、炉底和炉缸环行碳块与炉壳间的间隙,炉底水冷管以上到炉底钢板。
10.
A Study on Stability of Lining Structure for Plunge Pool with Inverted-arch Type;
反拱形水垫塘衬砌结构的稳定性研究
11.
Summarization on the design of 6.3/0.4kV drainage transformer substation on plunge-pool at Ertan Hydropower Station
二滩水电站水垫塘6.3/0.4kV排水工程设计综述
12.
The determination of base plate thickness, the calculation of base plate stability.
文章介绍了白山水电站消能塘结构布置、板厚度的确定以及底板稳定的计算。
13.
CEMENTITIOUS PRODUCTS
水泥楼屋面板和垫层
14.
coaster (drip mats), of paper paperboard or cellulose wadding
杯垫(垫托),纸、纸板或纤维素吸水纸制
15.
Applied Research on Water Cushion Pond Energy Dissipator of Xiaqiao Hydroelectric Power Station;
水垫塘消能工在下桥水电站的应用研究
16.
Application of PIV Technique for Water Flow in Water Cushion Pool;
PIV技术在水垫塘模型水流流动中的应用研究
17.
Quality Control of Anti-scouring and Anti-abrasion Concrete for the Water Cushion Pool of Xiaowan Hydropower Station
小湾水电站水垫塘抗冲耐磨混凝土质量控制
18.
The 2-D Numerical Simulation Flow Field of Plunge Pool Acted by Jets from High Arch Dam
高拱坝水舌作用下水垫塘流场的二维数值模拟