说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 北京地铁
1.
Finally, the computational results are compared with the field data of the subway in Beijing.
最后与北京地铁的实测资料进行对比。
2.
Undermining Construction Technique Research on Suzhou Street Subway Station of Beijing City;
北京地铁苏州街站暗挖施工技术研究
3.
The Language of Trajectory-The Analysis of the Guiding Sign System in Beijing Subway
轨迹中的语言—北京地铁导识系统探析
4.
Study on Marker System on Beijing Subway Stations
北京地铁车站导向标识系统调查分析
5.
Advanced Prevention of Accident to Ensure Safety of Subway Construction in Beijing
先其未然而防,确保北京地铁建设安全
6.
Line 13 of Beijing Metro is the first ground line of Beijing urban rail transit.
北京地铁13号线是北京城市轨道交通的第一条地面线路。
7.
Policy Investigation on Underground Space Development and Utilization in Area of Beijing Metro Station;
北京地铁站域地下空间开发利用政策初探
8.
Analysis of Ground Distortion for Xisi Subway Station on the Line 4 of Beijing Subway
北京地铁4号线西四站地面变形与分析
9.
Improvement of Cutter Disk of Shield for Sand-gravel Layer Construction in Beijing Subway
北京地铁砂卵石地层施工盾构刀盘的改进
10.
Improvement on cutter disc of tunneling shield for sandy cobble stratum in Beijing metro
北京地铁砂卵石地层盾构刀盘设计改进
11.
Application of New Austrian Tunnelling Method to Beijing Sub-way Construction
浅埋暗挖技术在北京地铁建设中的应用
12.
Several Problems about Revision of Specification for Inspection and Repair of Beijing Subway Cars
关于北京地铁车辆检修规程修订的若干问题
13.
The TCN system of localized metro vehicle in Beijing is introduced.
介绍了国产化北京地铁列车控制及网络系统。
14.
Operation Scheme for Beijing Metro Line 13 in Case of Breakdown
北京地铁13号线故障情况下运营方案研究
15.
The construction technology bury shallow and dig invisible of the station of Chongwenmen of 5th line of the underground in Peking
北京地铁五号线崇文门站浅埋暗挖施工技术
16.
Study on Calculation Method of Mined Tunnel Reliability Regarding Beijing Subway;
北京地铁矿山法隧道结构可靠度计算方法研究
17.
There are four underground lines in Beijing,
北京有四条地铁线,
18.
The Discuss of the Reform of the Management System of the Suburban Railway in Beijing Region;
北京地区市郊铁路管理体制改革探讨