1.
Prediction of foundation settlement of a heap of ore-port under multi-stage loading during period of use
某矿石码头堆场矿石分级压载的地基沉降预测
2.
On Ice Load of Caofeidian First Phase Ore Terminal Project
曹妃甸矿石码头一期工程冰荷载研究
3.
φ1400 pipe pile construction for 300000 dwt ore terminal
30万吨级矿石码头φ1400大管桩施工
4.
Application of CFG piles in stacking yard of an iron ore terminal
CFG桩在某铁矿石码头堆场中的运用
5.
Research on Simulation Optimization of Ore Handling System and Equipment Configuration on Ore Port;
矿石码头装卸工艺系统设备配置仿真优化
6.
Study on Developmental Strategy of Tianjin Port Yuanhang Ore Terminal Co., Ltd;
天津港远航矿石码头有限公司战略发展研究
7.
Technological & Economic Analysis of Transformation of the Iron Ore Wharf in Tianjin Port;
天津港铁矿石码头改造的技术经济分析
8.
The Design and Realization of the Port Monitor System Based on Fameview;
基于Fameview的矿石码头监控系统的设计与实现
9.
Simulation and Optimization of Handling System on Ore Port Based on WITNESS
基于WITNESS的矿石码头装卸系统仿真与优化
10.
Research and application of wastewater′s environmental treatment in ore terminal port
矿石码头港区生产废水环保处理的研究与应用
11.
Control System for Railway Train Loading Station at Caofeidian Iron Ore Wharf
曹妃甸矿石码头铁路装车站工程控制系统
12.
Cathodic Protection for Steel Pipe Pile of Ore Wharf No.3 and No.4 Berths in Beilun Harbor
北仑港区矿石码头3#、4#泊位钢管桩阴极保护
13.
Application of Pneumatic Lifting Method to Remove Bore Material from Large Diameter and Very Deep Steel Tubular Piles for Caofeidian Ore Terminal
气举法在曹妃甸矿石码头大直径超深钢管桩清除桩心土中的应用
14.
Research and Design of the Ore-terminal Central Control System Based on Industrial Ethernet;
基于工业以太网的矿石码头控制系统研究与设计
15.
Remolding Construction of Handling Technology Process of Phase One Project, Chaofeidian Ore Terminal
曹妃甸矿石码头一期工程装卸工艺流程改造施工
16.
The Application of Frequency-Conversion Driving in the Conveyer System of Shanghai Port Luojing Ore Terminal
变频驱动技术在上海港罗泾矿石码头皮带输送系统中的运用
17.
Design of the 200,000 DWT Specialized Ore Terminal of Qingdao Port
青岛港20万吨级矿石专用码头设计简介
18.
Study on Raman Spectrum Characteristics of Hsianghualite, Baotite, Huanghoite and Jixianite
香花石包头矿黄河矿及蓟县矿的拉曼光谱特征