说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 1000MW超超临界汽轮机
1.
Comprehensive Optimization of 1 000 MW USC Steam Turbine and Its Effects
1000MW超超临界汽轮机综合优化及成效
2.
Introduction of Steam Turbine Auxiliary System
1000MW超超临界汽轮机组辅助系统介绍
3.
Numerical Simulation on LP Exhaust Hood of 1000MW Ultra Supercritical Steam Turbines
1000MW超超临界汽轮机低压排汽缸数值模拟
4.
Shaft coupling connection technique for Siemens 1 000 MW ultra-supercritical steam turbines
西门子1000MW超超临界汽轮机联轴器连接工艺
5.
Analysis on Multi-order Static Frequency of Last Stage Long Blade of 1000MW Ultra Supercritical Turbines
1000MW超超临界汽轮机末级长叶片多阶静频分析
6.
Thermal stress monitoring & control in 1000 MW ultra-supercritical steam turbine
1000MW超超临界汽轮机热应力监测及自动控制
7.
Application of rapid-cooling systems of Simens 1 000 MW ultra-supercritical steam turbines
西门子1000MW超超临界汽轮机快冷系统的应用
8.
Design Feature and Operation Case of Dongfang Ultra-supercritical 1000 MW Steam Turbine
东方1000MW超超临界汽轮机设计特点及运行业绩
9.
Cooling Design for High Temperature Parts of Ultra-supercritical 1000 MW Steam Turbine
1000MW超超临界汽轮机高温部件的冷却设计
10.
LP Rotor Manufacturing Technology of 1000 MW Ultra-supercritical Steam Turbine
1000MW超超临界汽轮机低压转子制造技术研究
11.
Numerical Simulation on the Steam Admission Volute in the Intermediate Pressure Cylinder of 1000MW Ultra Supercritical Steam Turbine
1000MW超超临界汽轮机中压缸进汽蜗壳的数值模拟研究
12.
Design on Heat Treatment Technology and Material Optimization for Medium-pressure Conduit of Ultra-supercritical 1000 MW Steam Turbine
1000MW超超临界汽轮机中压进汽管化学成分优化及热处理工艺设计
13.
Process Research of Localization Manufacture for LP Rotor of 1000MW Ultra Supercritical Steam Turbines
1000MW超超临界汽轮机低压转子国产化加工工艺研究
14.
Shaft Manufacturing of 1000 MW Ultra-supercritical Turbogenerator for Zouxian Phase IV Project
1000MW超超临界汽轮发电机转轴加工工艺
15.
Technical Characteristics of 1000 MW Ultra-supercritical Turbogenerator
1000MW超超临界汽轮发电机技术特点
16.
Technological Innovation of Dongfang 1000 MW Ultra-supercritical Turbogenerator
1000MW超超临界汽轮发电机制造工艺创新
17.
1000 MW USC Turbine Erection in Taizhou Power Plant
泰州电厂1000MW超超临界机组汽轮机安装探讨
18.
Diaphragm Assembly Process of USC 1000MW Steam Turbines
超超临界1000MW汽轮机低压隔板装配工艺研究