1.
Analysis on Major Issues of Main Transmission System of Cars for Nanjing Metro Line 1
南京地铁1号线车辆主传动系统问题分析
2.
Localization of Carbon Blocks in Nanjing Metro Line 1
南京地铁1号线电客车轮缘润滑块国产化研究
3.
Application of Passengers' Information System of Nanjing Metro Line 1
旅客资讯系统在南京地铁1号线的应用
4.
Structure and Optimization of the Transmission System of Communication for Nanjing Metro Line 1
南京地铁1号线通信传输系统的构造与优化
5.
Localization of Filter Element of Air Compressor in EMU of Nanjing Metro Line 1
南京地铁1号线电客车空压机滤芯国产化
6.
Nanjing Subway Line 1 Passenger Forecasting for the Opening Period
南京市地铁1号线开通初期客流预测
7.
The Research on the Interior Design and Construction of the Nanking Subway No.1 Line;
南京地铁一号线室内设计与施工研究
8.
The Discussion about BT Financing Mode of Nanjing Subway Ⅱ;
浅议南京地铁二号线BT投融资模式
9.
Risk Assessment for Subway Projects:Taking Nanjing Subway Line 2 as an Example
地铁工程风险评价——以南京地铁2号线为例
10.
Multiple Fall-back Mode of Signal System at Nanjing Metro Line 2
南京地铁二号线信号系统多级后备控制模式
11.
Relationship Analysis on Station Capacity and Passenger Flow:A Case of Beijing Subway Line 1
北京地铁1号线车站设施与客流关系分析
12.
The Optimization of Control Program for Cooling Water System in Subway No.1 Lin of Nanjing
南京地铁一号线冷水机组控制程序优化策略
13.
Discussion on Risk Sources of Shield Construction in Nanjing Metro Line 2
结合南京地铁2号线谈盾构施工风险源
14.
Nanjing Metro Line 2 for Structural Safety Monitoring Technology Research Program
南京地铁2号线结构安全监测技术方案的研究
15.
Analysis and Suggestions of Land Use Patterns along Rail Transit Corridor-A Case Study of Beijing Metro Line 1
轨道交通沿线土地利用分析及建议——以北京地铁1号线为例
16.
urban transport organization scheme in the course of subway construction:A case of No. 2 subway in Nanjing;
城市地铁站点施工期交通组织方案研究——以南京市地铁二号线为例
17.
Structural Calculation and Experiment of U-beam in Nanjing Metro Line 2
南京地铁2号线东延高架线路U型梁结构计算及试验
18.
Study on Scheme of(75+100)m Single Pylon and Cable Plane Cable-Stayed Bridge on Line 2 of Nanjing Metro
南京地铁二号线(75+100)m独塔单索面曲线斜拉桥方案研究