1.
Analysis of the Influence of Partition Piles during Tunneling Excavation;
隔断桩在隧道开挖过程中的作用分析
2.
The Numerical Simulation and Supporting Methods of Deep Foundation Pit Excavation Process
深基坑开挖过程数值模拟及支护对策
3.
Stability monitoring and analysis of deep foundation pit in excavation
深基坑开挖过程中的稳定性监测分析
4.
Analysis of Earth Pressure and Displacement of Wall of Continuous Concrete Wall of Unloading Pit in Some Harbour
基坑开挖过程中地下连续墙位移与土压力分析
5.
Analysis under Excavation Unloading of Open-Pit Slope;
考虑开挖过程卸荷效应的露天矿边坡分析
6.
Behavior of Pile Foundation during Large-scale Deep Excavation;
大面积深基坑开挖过程中桩基受力特性研究
7.
Study of Dynamic Design Technique & Simulation of Soil Nailing in Deep Excavation;
基坑土钉支护的动态设计与开挖过程模拟研究
8.
Numerical Simulation on Excavation Process of Large-scale Underground Powerhouses with FEM;
大跨度地下厂房开挖过程的有限元数值模拟
9.
Study on Dynamic Warnning Method of Bank Slopes in Deep-Cut Valley during the Course of Excavation;
深切河谷岸坡开挖过程动态预警方法研究
10.
Numerical Simulation for Excavating Process and Stability Analysis of Bedding Rock Slope
顺层岩质边坡开挖过程模拟及稳定性分析
11.
Numerical Simulation for Excavation of Underground Caverns Under High Geostress Conditions
高地应力下地下洞室群开挖过程的数值模拟
12.
Effect of initial geo-stress dynamic unloading during tunnel excavation
隧洞开挖过程初始地应力动态卸载效应研究
13.
ANALYSIS OF DYNAMIC AND FRACTURED PHENOMENA FOR EXCAVATION PROCESS OF DEEP TUNNEL
深埋隧道开挖过程动态及破裂形态分析
14.
Evolution mechanism of Yuanjiawan landslide in the process of slope cutting and excavation
袁家湾滑坡在切坡开挖过程中的演化机理
15.
Application of dynamic feedback design to tunnel excavation
动态反馈设计在隧洞开挖过程中的运用
16.
Process Control and Countermeasures to Cavern Excavation in Right Bank of Jinping Hydropower Station Dam
锦屏电站大坝右岸洞室开挖过程控制及对策
17.
Analysis of Rock Stress Field Variation in Two Circular Caverns during the Excavation Process
双圆形洞室群开挖过程围岩应力场变化分析
18.
Behavior of up-lift pile foundation during large-scale deep excavation
抗拔桩在大面积深开挖过程中的受力特性分析