1.
Controlled Blasting Practice on the Foundation Excavation of the East River in the South-to-North Water Transfer Project
南水北调东河暗渠基础开挖控制爆破实践
2.
The Application of Bolt-shotcrete-net Combined Supporting Technology to Bridge Foundation Digging
锚喷网支护技术在桥梁基础开挖中的应用
3.
Application of acoustic wave test in excavation of dam foundation of Nuozadu Hydropower Station
声波测试在糯扎渡大坝基础开挖中的应用
4.
Technique for Deep Pit Construction with No-supported Dig
无支护式明挖扩大基础深基坑开挖施工技术
5.
The Influence to the Excavation of Foundation Pit by the Basement and Piles Nearby;
地下室及桩基础对邻近基坑开挖的影响研究
6.
Numerical Analysis of Existing Pile Due to Excavation;
基坑开挖对既有桩基础影响的数值分析
7.
The Analysis of Interaction between Excavation of Foundation Pit and Nearby Pile Foundation;
基坑开挖与邻近桩基础的相互影响分析
8.
Numerical Analysis of the Adjacent Foundations in Foundation Excavation Engineering;
基坑开挖对邻近基础变形影响的数值分析
9.
Elastio-plastic Numerical Analysis of Effect on Performance Characteristics of Adjacent Piled Raft Foundation Due to Pit Excavation
基坑开挖对邻近桩筏基础特性影响的数值分析
10.
Manual Excavated Continuous Concrete Wall of the Arch Bridge Abutment Foundation in the Loess Region
黄土地区拱桥桥台人工开挖地下连续墙基础
11.
Development and Application of New Dig Foundation with Lateral Beam for Transmission Lines
送电线路新型带挡板掏挖式基础的开发应用
12.
Numerical Studies on Transaction of Underground Opening and Foundation of High-rise Building;
地下空间开挖和高层建筑基础相互影响的研究
13.
The application of trenchless technology in urban infrastructure construction
非开挖技术在城市基础设施建设中的应用
14.
Numerical simulation on influence of tunnel excavation on adjacent pier foundation
隧道开挖对临近墩基础承载力影响的数值模拟
15.
Analysis of Excavation Simulation and Field Measurements of South Anchorage Foundation Deep Pit of Yangluo Changjiang River Highway Bridge
阳逻长江公路大桥南锚碇基础深基坑开挖模拟与实测分析
16.
Foundation Bottom Excavation and Mat Construction Technology for Super Deep Foundation Pit of Shanghai IFC
上海国金中心超深基坑底层土方开挖及基础底板施工技术
17.
Influence of Excavation in Deep Sludge Site on Foundation with Tubular Piles and Accident Treatment
深厚淤泥场地基坑开挖对管桩基础的影响及事故处理
18.
RCC casting &backfilling work for CW pump house is in progress. Excavation forCW channel was stared on April 2.
循环水泵房正在浇筑池壁混凝土和基础回填,前池于本月2日开挖,开挖工作正在进行.