说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 开河日期
1.
Factor Analysis for Ice Flood and Model Research for Freeze-up Time and Break-up Time in the Inner Mongolia Reach of the Yellow River;
黄河内蒙段凌汛成因分析及封开河日期预报模型研究
2.
The Plundering of Japan toward Salt Ponds of Hedong in the Anti - Japanese War;
抗日战争时期日本对河东盐池的掠夺
3.
Receive Location '{0}' has Start Date later than the Stop Date. Change either the Start Date or the Stop Date.
接收位置“{0}”的开始日期晚于停止日期。请更改开始日期或停止日期。
4.
The date range fixed from date is after the to date
日期范围的固定开始日期晚于完成日期
5.
We'll bring the date of the meeting forward from the 20th to the 18th.
我们要把开会日期从20日提前到18日。
6.
The date of the meeting was advanced from the 10th to the 3rd of June.
开会日期从6月10日提前到6月3日。
7.
The date of the meeting was advanced from the 1 0 th to the 3 rd of June .
开会日期从六月十日提前到六月三日。
8.
The Timeline finish date must be later than the start date.
时间线完成日期必须在开始日期之后。
9.
The ending date must be set later than the starting date.
结束日期必须要设得比开始日期晚。
10.
'From' Date must be earlier than 'To' Date.
“开始”日期必须早于“结束”日期。
11.
Start date cannot be set later than the Finish date.
开始日期不能设置为晚于完成日期
12.
The schedule's Start Date cannot be before it's End Date.
调度的开始日期不能早于结束日期。
13.
Date-Time display options (date-time picture switch)
日期-时间显示选项(日期-时间显示开关)
14.
The phase start date must occur on or before the end date.
项目开始日期不得晚于结束日期。
15.
Timing date each month
每月开始计时的日期:
16.
He announced the date of the meeting.
他公布了开会日期。
17.
Has the date of the meeting been fixed?
开会的日期决定了吗?
18.
Please make certain of the date of the meeting.
请把开会的日期弄清楚。