1.
Numerical Analysis on Deformation and Stress of the Surrounding Rock of Dichotomy Tunnel
分岔隧道的围岩应力及变形数值分析
2.
A Study on 3D Numerical Simulation of Branch Tunnel Construction
分岔隧道施工三维数值仿真模拟研究
3.
Damage analysis and optimum research on construction process for forked tunnel under bias pressure
偏压分岔隧道施工过程损伤破坏分析与优化研究
4.
Key Technology Study on Forked Tunnel Design and Construction;
分岔式隧道设计施工的关键技术研究
5.
In-situ Measurement and Analysis of the Axial Forces in Rock Bolts in a Bifucated Tunnel
分岔公路隧道锚杆轴力现场监控量测与分析
6.
Study on Construction Method for Intersectional Turnout of Large Span Highway Tunnel
大跨度公路隧道交叉分岔段施工方案研究
7.
Study on Bifurcating Form and Mechanical Behaviors of Underground Interchange Tunnel
互通式地下立交隧道分岔形式和施工力学行为研究
8.
The road branches at the bottom of the hill.
这条道路在山麓分岔。
9.
The main road branches off to the left.
大道向左分出一条岔路。
10.
Analysis on spatial vibration of train-turnout-continuous frame bridge with train running through turnout branch
侧向过岔时列车-道岔-连续刚构桥空间振动分析
11.
The Mechanics Analysis of Continuous Bed Slab of Ballastless Track of Switch;
道岔区无碴轨道连续道床板力学分析
12.
Development of California Switch and Suggestions of Application in Tunnel Construction
浮放道岔的发展及在隧道施工中应用的建议方案
13.
The main road fans out at that point in at least three directions.
主要大道到了那里至少分出3个岔道。
14.
Their paths diverged at the fork in the road.
他们在道路的岔囗处分道而行。
15.
Another turning point, a fork stuck in the road.
又是一个转折点,一个岔口分开了道路。
16.
Their path diverged at the fork in the road .
他们在大路的岔口处分道而行。
17.
We stand now where two roads diverge.
我们正处在两条道路分岔的地方。
18.
The road forks soon after the bridge.
过了桥不远,道路就分岔了。