1.
Design of Mining Method and Mining Practice in One Gold Mine of Songxian
嵩县某金矿采矿方法设计与开采实践
2.
Mining design procedures of the deep mining process sublevel caving stoping method
无底柱分段崩落采矿法回采设计方法
3.
The ultimate aim of a nine design is to determine the develompent work involved and resources required by adopting one or more specific altematives.
矿山设计的目的在于确定开拓方式、择一种或多种采矿方法回采矿石。
4.
Optimization Design of Ore Accumulating Trench by Sublevel Open Stoping
分段空场采矿法聚矿堑沟的设计优化
5.
Taking Xincheng Gold Mine as the example, the law of ground stress of metal mines and the optimization of mining design for underground mines are presented.
以新城金矿为实例,介绍了金属矿山地应力的规律性及地下矿山采矿设计优化方法;
6.
The Application of Digital Simulating Method in the Optimization on Mining System Design of Block Stoping;
阶段空场法采矿系统设计优化的数值分析方法及应用
7.
The adaption of mining method is the similarity between the mining conditions of designed mine and adaption capacity.
而采矿方法的适应性实质上是指其适应范围与设计矿山开采条件的近似程度。
8.
Discussed shallowly the use "the Behre law" carries on the mineral aggregate gradation to design
浅谈采用“贝雷法”进行矿料级配设计
9.
The Design and Study of Mining Method under the Village for Aiyou Mine 106 Mining Area;
艾友矿106采区村庄下开采方案的设计研究
10.
Code for mining design of non-ferrous mines
有色金属采矿设计规范
11.
Analysis and Comparison of Two Design Schemes on No.12 District in No.2 Mine of Yangquan Coal Group
阳煤二矿十二采区设计方案比较与分析
12.
Resolution to Corner Coal Exploitation Scheme of Aged Coal Mine
衰老矿井边角呆滞煤开采方案设计研究
13.
Schematic design of full trackless underground mining of Aigedzor copper-moly ore
艾格佐尔铜钼矿全无轨地下开采方案设计
14.
South Wing Jixian Coal Mine Five Coal Mining Area Underthe Extension of the New Design Verification
集贤煤矿南翼五层煤下延采区新设计方案论证
15.
The Research and Practice on Mining Method for Fu-Cao Orebody in Ancient Mine Area
古采区伏槽矿采矿方法的研究与实践
16.
Prediction Factors Analysis on Coal Mining Subsidence and Calculating Method
煤矿采空沉陷预测因素分析及计算方法
17.
Research on the Automatic Embedding of Mining Subsidence Forecast Data into Mine DEM
开采沉陷预计数据自动嵌入矿区DEM的方法研究
18.
Discussion on raise design options on -10m~+150m level Carboniferous first mining area in Datai well of Muchengjian Coal Mine
木城涧煤矿大台井-10m~+150m水平石炭纪开采首采区上山设计方案探讨