1.
Main Points in Preliminary Work of Landfilling Construction;
垃圾填埋场建设前期工作重点问题分析
2.
Construction Project Work at Earlier Stage:Scientific Management;
论项目建设前期工作科学化管理的思路
3.
The problems existed in the prior period of construction project,such as laggard work and imperfect scheme,are pointed out in this paper.
指出了在建设项目前期工作中存在的问题 ,建设项目前期工作滞后 ,前期方案深度不够。
4.
No efforts will be spared to complete the preparatory work for the south-to-north water diversion project, in order to start the project as quickly as possible.
抓紧“南水北调”的前期工作,力争早日开工建设。
5.
Meanwhile, efforts will be stepped up to complete the preparatory work for the project to divert the water in the south to the north and begin the construction of the project as quickly as possible during the 10th Five-Year Plan period.
同时,加紧南水北调工程的前期工作,力争“十五”期间尽早开工建设。
6.
Control of Impact from Pre-design Work on Construction Cost;
谈谈设计前期工作对建筑造价控制的影响
7.
Study on the Management of Highway Project Preparation Procedures;
公路建设项目前期工作程序管理的研究
8.
Innovation on Power Grid Construction Project Management at Preliminary Stage in Anhui Province
安徽电网建设项目前期管理工作的创新与效益
9.
Analysis on Procedure and Practice of Initial work of Hunan Expressway
高速公路建设项目前期工作程序及实践分析
10.
On ideas to extend prophase demolition work of urban construction projects in Taiyuan
太原市城市建设项目前期拆迁工作的开展思路
11.
You have proposed a number of major prospecting and design projects to prepare for construction, and you plan to complete them ahead of schedule.
你们提出一批重大的勘察设计项目,准备提前做好建设的前期工作,
12.
Investment and Cost Control on Chemical Engineering Construction Projects in Feasibility Study;
化工建设项目前期可研工作中投资和成本的控制
13.
Measures on Project Cost Control during Preparation of Highway Construction;
前期工作阶段控制公路工程建设项目造价目标的措施
14.
Preparatory Work Discussion on Power Grid Construction Project Based on Target Management & Reconstruction Project Theory
基于目标管理、再造工程理论的电网建设项目前期工作探讨
15.
Accelerate Work in Early Phase of Railway Projects to Ensure Smooth Progress of Railway Construction;
加快推进铁路项目前期工作 确保铁路建设顺利进行
16.
Effect of the State Investment System Reform on the Preliminary Engineering in Petroleum Construction Project;
国家投资体制改革对石油建设项目前期工作的影响
17.
Controlling Approach to the Project Cost in the Prophase of Capital Construction;
工程造价在基本建设前期的控制途径
18.
On Proceeding and Positive Control in Construction Project Cost;
工程建设投资的前期与事先主动控制