说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 龙滩转轮
1.
Longtan runner site manufacturing processes and facilities optimization
龙滩转轮现场制造工艺流程及设备配置的优化
2.
Analysis and Treatment of Rotor Dynamic Ground Fault of Hydro Generator in Longtan
龙滩水轮发电机转子动态接地故障分析及处理
3.
Three Dimensional Simulation and Low-head Operation Stability of Longtan 700MW Turbine Runner
龙滩水电站700MW机组转轮水力计算及低水头运行稳定性优化分析
4.
Review on inviting tenders for hvdroturbine generator sets of Longtan Hydropower Station;
承上启下 精益求精——龙滩水轮发电机组招标回顾
5.
Stie Fabricated and Contrast Analysis of Split Runner of Turbine No1 and No2 for Yantan Power Plant
岩滩水电站1~#、2~#水轮机分半转轮的工地组焊及对比分析
6.
The Analysis of Reasons of Vane Cracks Drop of Datang Yantan Hydropower Co.,Ltd.Hydraulic Turbine and its Countermeasures
岩滩发电公司水轮机转轮叶片裂纹及掉块原因分析与处理
7.
To Build"Competitive Longtan Product"Culture with Longtan Characteristics
构建具有龙滩特色的“精品龙滩”文化
8.
Forge A “Top-quality Longtan” and A “Green Longtan” and Form an Enterprise Culture with Longtan Characteristics;
打造“精品龙滩、绿色龙滩” 建设具有龙滩特色的企业文化
9.
In this paper, the material, structural properties and the site fabricating technology of stainless steel split runner for Ertan power plant were introduced.
本文介绍了二滩水电站不锈钢分瓣转轮的材料、构性能和现场组焊工艺技术。
10.
Or you can go exploring for fossils of the earliest residents of the Gobi-dinosaurs.
或去探索戈壁滩早期的原居民-龙化石。
11.
Flood Prevention Dispatching Decision Support System in Huang Longtan Hydro Power Station
黄龙滩电厂防洪调度决策支持系统
12.
Estimation of Adit Dirt Volume in Longtan Hydropower Station Dam Area
龙滩水电站坝址区平洞结垢量的估算
13.
Elementary Introduction on the Cost Control in the Joint Venture by Sinohydro Engineering Bureaus 1,4,7 & 8;
浅谈龙滩工程1478联营体的成本控制
14.
Financing for the Longtan Hydropower Project and its funds management;
龙滩水电站工程融资和资金使用管理
15.
Attenuation of P,S and coda waves in Longtan reservoir region
龙滩水库地区P波、S波和尾波衰减
16.
Optimization of Protection Configuration for 10kV Station Transformers of Longtan Hydropower Station
龙滩水电站10kV厂用变保护的优化配置
17.
Modeling of 170MW Unit Governor System of Huanglongtan Hydropower Plant
黄龙滩水电厂170MW机组调速系统建模
18.
Analysis on reform of transformer protection of 10 kV service power of Longtan Hydropower Plant
龙滩电厂厂用10kV变压器保护改造分析