说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 盾构区间
1.
Study on Shield Drilling Technology for Shielding Section of Kecun Station-Datang Station on GuangZhou Metro Line 3.;
广州地铁三号线客村~大塘盾构区间盾构机掘进技术研究
2.
Risk Analysis and Assessment during Construction of Metro Shield Section Tunnel;
地铁盾构区间隧道施工风险分析及评价
3.
Risk analysis and risk control of shield zone on Guangzhou subway the sixth line
广州地铁六号线盾构区间风险分析及风险控制
4.
Construction Technology of Shield Tunnel in a Section of Shanghai Subway No.7 Line
上海轨道交通7号线某标盾构区间隧道施工技术
5.
The Application of Enlarging Shield Tunnels Technology in Construction of Dongshankou Station Tunnel
盾构区间扩挖技术在东山口地铁站施工中的应用
6.
Feasibility Analysis of Shield Driving Method Used in Interzone Tunnel in Chengdu Metro;
成都地铁区间隧道盾构法可行性分析
7.
On analysis of shield construction through existing subway in running tunnel
盾构施工下穿既有地铁区间隧道分析
8.
Technology of Relieving a Shield from Trapping at Beginning Construction Which is Applied in a Subway Construction District of Shenyang City
沈阳地铁某区间盾构始发脱困施工技术
9.
Study on transcending technology of shield tunnel during construction in Shanghai
上海某地铁区间盾构超越施工技术研究
10.
COMPARISON AND ANALYSIS OF DIFFERENT SHIELD TUNNEL LINING INTERNAL FORCES DESIGN METHOD OF METRO RUNNING
地铁区间盾构隧道衬砌内力计算方法比较分析
11.
On Shield Method Construction Techniques of Shenzhen Metro Crossing-railway Interval Tunnel
深圳地铁穿越铁路的区间隧道盾构法施工技术
12.
Study on the Mechanics Behavior of Segment of Interval Shield Tunnel in Metro by Field Test;
地铁区间盾构隧道管片衬砌结构力学行为的现场试验研究
13.
Chengdu Metro Running Tunnels in the Shield Construction Caused the Numerical Simulation of Surface Subsidence;
成都地铁区间隧道盾构施工引发地表沉降的数值模拟研究
14.
Study on the Mechanism of Ground Surface Settlement Induced by Shield Construction in Xi an;
西安市地铁区间隧道盾构施工对地表沉降机理的研究
15.
The contradictions between various ethnic groups, regions and classes would become sharper and, accordingly, the contradictions between the central and local authorities would also be intensified.
民族矛盾、区域间矛盾、阶级矛盾都会发展,相应地中央和地方的矛盾也会发展,
16.
The shield driven tunnel of Yuexiu Park to Sanyuanli in No. 2 line of Guangzhou Metro has been built and used in informal business in 2002.
广州地铁二号线越秀公园-三元里区间盾构隧道已于2002年建成并投入试运营。
17.
Study on Land Subsidence Caused by Section of Sanyuanqiao~Liangmaqiao Station on Beijing Metro Line 10 Running Through Existent Buildings;
北京地铁十号线三元桥~亮马河站区间盾构旁穿建筑物地表沉降规律研究
18.
The Portal Level Grouting Reinforcement of Shield Uncannily in Jianhua Station of Hangzhou Metro Line NO.1(Peng Bu Station to Jianhua Station)
杭州地铁1号线(彭埠站~建华站区间)建华站盾构出洞洞门水平注浆加固技术