说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 斜拉桥稳定
1.
Discussion on calculating method for stability of cable-stayed bridge with single tower and single cable plane
独塔单索面斜拉桥稳定性计算方法的探讨
2.
Static Stability Analysis of Long-span Concrete Cable-Stayed Bridge;
大跨度混凝土斜拉桥静力稳定性分析
3.
Static Stability Anslysis of Long-span Composite Beam Cable-Stayed Bridge
大跨度组合梁斜拉桥静力稳定性分析
4.
Analysis of the Overall Stability for the Large-span Concrete Cable-stayed Bridge
大跨度混凝土斜拉桥整体稳定性分析
5.
Application of ANSYS in the stability analysis of cable-stayed bridge
ANSYS在斜拉桥的稳定分析中的应用
6.
Wind Induced Vibration Analysis in Time Domain and Aerostatic Stability Study for Cable-Stayed Bridge
斜拉桥风振响应时域分析及静风稳定性研究
7.
Flutter, Buffeting and Aerostatic Stability Analysis for Long-span Cable-stayed Bridges;
大跨度斜拉桥颤抖振响应及静风稳定性分析
8.
The Stability Analysis of the Long-Span Cable-Stayed Concrete Filled Steel-Tubular Arch Bridge;
大跨度斜拉钢管混凝土拱桥的稳定性分析
9.
The Research on the Stability and Model Test of the Long-span Cable-stayed Arch Bridge;
大跨度斜拉拱桥的稳定性及模型试验研究
10.
Static Analysis and Unitary Stability Research of the Cable-Stayed Bridge with Single Tower;
独塔斜拉桥静力分析及整体稳定性研究
11.
The Research on Force Bearing Properties and Stability of Long-span Cable-stayed Bridges under Construction;
大跨度斜拉桥施工过程受力特性与稳定性分析
12.
Study of Non-Linear and Stability of Long-Span Cable-Stayed Bridge;
大跨度斜拉桥非线性及整体稳定性研究
13.
Study on Wind Stability of Super Long-Span Cable-Stayed Bridge under Construction
超大跨度斜拉桥施工全过程抗风稳定性研究
14.
Study of Stability of Long-Span Composite Deck Cable-stayed Bridge during Construction Process
大跨度组合梁斜拉桥全过程稳定性研究
15.
Analyses of Operation Stage, Seismic Response and Stability for Low-Pylon Cable-Stayed Bridge Based on Plate Element;
基于板单元的矮塔斜拉桥运营阶段计算和地震与稳定分析研究
16.
Analysis for Stress of Truss Members and Stability of Structures in the Construction Process of Oblique-pulling Truss Bridges;
斜拉桁架桥安装过程中杆件应力和结构稳定分析
17.
Comprehensive Method of Determining Reasonable Cable Forces of Completion State of Bridge of the Cable-Stayed Bridges;
斜拉桥成桥合理索力确定的综合方法
18.
Analysis of Stayed Cable and Study on the Reasonable Finished State of Cable-stayed Bridge;
斜拉桥拉索的受力分析与合理成桥状态的确定