1.
The Construction Methods of the Outside Tube Wall withφ17.80M under the Tower Shaft in Dragon Mine
龙家堡煤矿主井井塔筒形基础施工方法
2.
Stability Analysis and Design of the Main Shaft Tower Foundation at Xiagao Iron Mine
下告铁矿主井井塔基础稳定性研究与设计
3.
On the Derrick Installation of ShaftⅣ_G In main Shaft of a Coalmine
浅谈塔然高勒煤矿主井IV_G凿井井架安装
4.
Deep and Ultra-deep Well Cementing Technology with Low Density Slurries in Tahe Oilfield
塔河油田深井超深井低密度固井技术
5.
Numerical calculations and experimental investigations on slope diffuser of main mine fan
倾斜式矿井主扇扩散塔的数值计算与实验研究
6.
Composite Liner Cementing Technology in Subsalt Well AT9 in Block Tahe.
塔河油田盐下井AT9井复合尾管固井技术
7.
660m depthdrilling shaft lining structure design and analysis of main shaft Ban Ji mine
板集主井660m深钻井井壁结构设计分析
8.
Drilling Fluid Technology for Horizontal Well YT2-6H in Tahe Oilfield
塔河油田YT2-6H水平井钻井液技术
9.
Liner-hanger(250.8/244.5mm) Salt Bed Cementing Technology for Tahe Oilfield
塔河油田盐层井250.8/244.5mm尾管固井技术
10.
Cementing Technology for Ultra Deep Horizontal Wells in Block Donghe,Tarim.
塔里木东河油田超深水平井固井技术
11.
He's employed on the oil rigs.
他受雇在油井钻塔工作.
12.
Application of short radius horizontal well drilling technology in ultra-deep well in Tahe oilfield
小井深超深短半径水平井钻井技术在塔河油田的应用——以TK1105CH井为例
13.
Study and Application of Grouting behind Main Shaft Wall to Ronghua Vertical Shaft
荣华立井主井井筒壁后注浆的研究与运用
14.
Study on the Mechanism of Joint Load-bearing of Various Sections in a Mine Shaft Tower System;
井塔—桩筏基础—地基—井壁的共同作用机理研究
15.
Oil well logging to find missing and channeling techniques in Tahe oilfield
油水井找漏找窜测井技术在塔河油田的应用
16.
The Intensity Testing of Main Well Headframe in Dai Zhuang Mine Shangdong
山东岱庄生建煤矿主井井架强度检验
17.
The main level of a mine.
主坑道矿井的主要位置
18.
The towers are 170 ft above the caisson.
沉井以上的塔柱高度为170英尺。