1.
Reinforcement of Prestressed Concrete Curved Box Girder Bridge
某预应力混凝土曲线连续箱梁桥加固
2.
Analysis of the temperature effect on pre-stressed curve concrete continuous box girder
预应力混凝土曲线连续箱梁温度作用效应分析
3.
Research on Bearing Arrangements of Pre-stressed Concrete Curved Continuous Girder Bridge
预应力混凝土曲线连续箱梁桥支座布置研究
4.
Constructing Method of Influence Surface on the Structural Space Responses of Cured Continuous Box Girder Bridges
曲线连续箱梁桥结构空间效应影响面的建立方法
5.
Study on Techniques of Supporting System of Short Radius Curve Continuous Box Beam Construction in Soft-Ground Area;
小半径曲线连续箱梁在软基地区施工时支撑体系技术研究
6.
Eccentricity of curved continuous girder bridge and it's influence on bearing reaction
曲线连续箱梁桥的偏心距及其对支座反力的影响
7.
In this article, authors introduce the construction techniques and quality control measures of prestressed technology in large-tonnage curve box beam of Kunshan viaductⅡ.
介绍昆山高架桥Ⅱ吨位曲线连续箱梁预应力施工工艺及其质量控制措施。
8.
Analysis for Prestressing of Curved Continuous Box Girder Bridges
箱型截面曲线连续梁桥的预应力分析
9.
Study on Side Reaction of Prestressed Concrete Continuous Curve Box Girder Bridge;
预应力混凝土连续曲线箱梁桥侧向效应研究
10.
Limited unit model and side moving of single bore continuous curve many room box beam bridge
单孔多室连续曲线箱梁桥有限元模型及侧移
11.
Study of indexes of continuous girders (double track line) erected with cast-in-place cantilever method;
悬浇连续箱梁(双线)梁部指标的研究
12.
Study on Contributory Factors on the internal Force and Deformation of P.C. Continuous Curved Girder Bridge;
影响预应力混凝土连续曲线箱梁内力和变形的相关因素的研究
13.
Study on Stability and Dynamic Characters of Curved Continuous Concrete Box Girder Bridge with Single-Supported Pile;
独柱支承连续曲线混凝土箱梁桥的稳定性能及动力特性研究
14.
Key Construction Techniques on Fly-over Continuous Box Girder on Passenger Dedicated Line
客运专线跨线连续箱梁施工关键技术
15.
The linearis monitoring under skew continuous box girder bridges cast with balanced cantilever method
悬臂浇注斜交连续箱梁桥的线形监控
16.
Study on Construction Control of Cantilever Erection Continuous Curved Girder Bridge;
悬臂拼装曲线连续梁桥施工控制研究
17.
Determination of Criterion Condition for Replacing Curve by Straight Line of High-pier Continuum Curved Bridge
高墩连续曲线梁桥以直代曲判别条件的确定
18.
Alignment Control of Continuous Box Girder Bridge in Construcion of Long Span by Segments
大跨度分段施工连续箱梁桥的线型控制