1.
Analysis on Problems of Top Coal Loading Technique Replaced by Tamping Coking Technique
顶装煤工艺改为捣固炼焦工艺后的问题分析
2.
Application of the hoisting jack made by ourself in install of large colliery equipment
自制千斤顶在煤矿大型设备安装中的使用
3.
Research and Exploration on High-power Fully Mechanized Coal Caving Technology
大功率综采放顶煤装备技术研究与探索
4.
The Application of Fully-mechanized Roadheader Equipped Temporary Roof Supporting Device in Coal Mine
综掘机载式临时护顶装置在煤矿的应用
5.
after insuring that both front and rear oven doors are sealed, coal is charged into the Oven through three or four top holes.
保证前、后炉门都密封好后,煤从碳化室顶部的3个或4个开孔装入。
6.
Stability Analysis and Control Experimental Investigation on the Top Pressure of Blast Furnace in a TRT Unit;
高炉煤气余压发电装置中炉顶压力稳定性分析与控制试验研究
7.
(of a ship)be loaded with a supply of coal
(指轮船)被加煤,上煤,装煤.
8.
Top Coal Crushing Mechanism and Determination of Roof Caving Height in Roof Caving Workface
放顶煤工作面顶煤破碎机理及放煤高度的确定
9.
One that removes tops or puts tops on.
卸顶工,装顶工拆除或安装顶状物的人
10.
To furnish(an arch) with a keystone.
用拱顶石装饰(拱顶)
11.
Study on Top Coal Caving of Horizontal Section Top Caving in Steep Seam;
急倾斜水平分段放顶煤顶煤放出规律研究
12.
The Three-dimensional Visualization Simulation of Top-coal Movement Regulation on the Base of OpenGL;
基于OpenGL放顶煤顶煤运动规律的三维可视化仿真
13.
To form, furnish with, or serve as a top.
形成顶部,装设顶部,用作顶部
14.
Study on Roof and Top-Coal Classification and Application in Fully Mechanized Top-Coal Caving Face;
综放面顶板(顶煤)分类及应用研究
15.
Something, such as a light fixture, that is located above head height.
顶部装置安装在头顶的固定装置,如电灯装置
16.
Study on Gateway Top Caving Technology for Steep-inclined Coal Seam
急倾斜煤层巷道放顶煤回采工艺研究
17.
Research on Equipments Coordination for Shearer in Soft Coal Thin Seam with Hard Roof
硬顶软煤薄煤层滚筒采煤机设备配套研究
18.
Research on Top-coal Caving Difficult Degree of 8-1 Coal Seam of Baode Colliery in Shendong Mining Area
神东矿区保德煤矿8-1煤顶煤可放性研究