说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 前置掺气坎式阶梯溢洪道
1.
Calculation of aerated water depth and energy dissipation rate of a pre-aerator stepped spillway
前置掺气坎式阶梯溢洪道掺气水深及消能率的计算
2.
Water Flow Regime and Flow Velocity Behaviors in Stepped Spillways with Aerated Piers
掺气分流墩台阶式溢洪道的水流流态和流速特性
3.
Model Study on Hydraulics of Air-Entraimented Flow on Stepped Spillways;
台阶式溢洪道强迫掺气水流水力特性的试验研究
4.
Water flow regime and flow velocity behaviors in stepped spillways with aerated piers are studied via the model tests.
通过模型试验 ,研究了掺气分流墩台阶式溢洪道的水流流态和流速特性。
5.
Discharge Test of Flexible Lining Stepped Spillway and Analysis of Hydraulic Characteristics
柔性衬护阶梯式溢洪道过水试验与水力特性分析
6.
Tests and research on aeration and corrosion reduction for spillway of Bakun hydropower station
巴贡水电站溢洪道掺气减蚀试验研究
7.
Experimental Studies on Aerator With Vertical Drop and Lateral Sudden Enlargement form for Three Grorges Project?s Outlets
三峡工程泄洪深孔突扩跌坎式掺气的试验研究
8.
Study on Air Entrainment to Alleviate Cavitations and Energy Dissipation & Scour Protection of the High Head Spillway;
高水头溢洪道的掺气减蚀与消能防冲研究
9.
Study on Aeration Mitigation of Cavitation for the Spillway of TIANSHENGQIAO-1 Hydropower Station;
天生桥一级水电站溢洪道掺气减蚀研究
10.
Aeration of skimming flow on stepped spillway combined with flaring gate piers
与宽尾墩联合使用的阶梯溢流面水流掺气问题研究
11.
Experimental investigation on the pressure characteristics of skimming flow on stepped spillways
台阶式溢洪道滑行水流压强特性的试验研究
12.
Study on the characteristics of time-average pressure of skimming flow in stepped spillway
台阶式溢洪道滑行水流时均压强特性研究
13.
multi-level outlet shaft spillway
多层进水竖井式溢洪道
14.
The energy dissipation rate is 40 to 70% higher than that of the skimming spillway.
在试验范围内,台阶式溢洪道与光滑溢洪道比较,消能率可以提高40% ~70%。
15.
escalator tunnel
阶梯式自动电梯隧道
16.
Experimental Research on the Presented Water-Surface Curve of Skimming Flow on Stepped Spillways and Energy Disspation
台阶式溢洪道滑行水流水面线和消能效果的试验研究
17.
Test Study on the Upstream Partof Side Channel Spillway and Stepped Spillway of the First Step Hydropower Stationin in Gang-Qu River;
岗曲河一级水电站侧槽溢洪道上游部分及台阶溢洪道试验研究
18.
Tests and research on aeration facility for spillway tunnel of Miaojiaba hydropower station
苗家坝水电站溢洪洞掺气设施的试验研究