1.
Finite Element Analysis on 100-Meter Rail Temperature Field of U75V Steel during Cooling before Straightening
百米U75V钢轨矫直前冷却过程温度场的有限元分析
2.
Influence of Rolling Reduction on Pearlite Grain Size in Heavy Rail of Steel U75V
轧制变形对U75V重轨钢珠光体晶粒度的影响
3.
Fracture Analysis of U75V Welding Rail during Installing Process
U75V焊接钢轨线路铺设时的断裂原因分析
4.
Research of Curvature and Residual Stress before Straightening on 100-meter Rail
百米钢轨矫前弯曲度与残余应力的研究
5.
Two new 100-meter-rail-hoisting bridge cranes featuring synchronous movement based on wireless control
无线并车吊运百米钢轨新型桥式起重机
6.
Development and Application of Metallurgy Technology of High-Speed Heavy Rail with 100 m in WISCO
武钢高速铁路用百米重轨钢冶炼技术的开发与应用
7.
To Enhance the Procedure Management and Defect Modification to Improve the Efficiency of Loading and Sending Out of 100-Metre Rail
提高百米重轨装车作业率措施的研究
8.
Fish-plates for 50 kg/m steel rails
GB/T184-1963每米50公斤钢轨用鱼尾板式尺寸
9.
Fish-plates for 43 kg/m and 38 kg/m steel rails
GB/T185-1963每米38及43公斤钢轨用鱼尾板型式尺寸
10.
Tie-plates for 43 kg/m and 38 kg/m steels rails
GB/T187-1963每米38及43公斤钢轨用垫板型式尺寸
11.
Tie-plates for 50 kg/m steel rails
GB/T186-1963每米50公斤钢轨用垫板型式尺寸
12.
Tie-plates--Technical requirements for 38kg/m to 50 kg/m steel rails
GB/T2826-1981每米38~50公斤钢轨用垫板技术条件
13.
Study on Higher Than 100 Meters Reinforced Concrete Chimney Blasting Demolition;
百米以上钢筋混凝土烟囱拆除爆破研究
14.
Research on Analysis Method for the Carbody Steel Structure of the Cement Tank Car Exported to Thailand
出口泰国米轨水泥罐车车体钢结构分析方法研究
15.
rail bound manganese steel frog
钢轨组合锰钢叉心辙叉
16.
Hundreds of people be injure when the train go off the rail
火车出轨时,数百人受伤
17.
Hundreds of people is injure when the train go off the rail.
火车出轨时, 数百人受伤。
18.
Hundreds of people were injured when the train went off the rails.
火车出轨时,数百人受伤。