1.
Stability analysis for long-short compound bolt reinforcement in layer marlite rock slope with finite different method
长短锚杆组合加固泥灰岩边坡稳定性的有限差分分析
2.
Analysis for Long-short Compound Bolt Reinforcement in Layer Rock Slope
层状岩体边坡长短复合锚杆加固的稳定性分析
3.
The Application about Recoverable Bolt in Short Walling Drift
可回收锚杆在短壁开采巷道中的应用
4.
The Experiment Study of Full Grouting Bolt by Optical Fiber Grating Sensing;
基于光纤光栅测试的全长锚固锚杆实验研究
5.
Contrastive Study of Sectionalized and Wholly Grouted Anchor Load Transfer Machanism
多段型与全长粘结型锚杆锚固机理的对比研究
6.
COMPREHENSIVE RESEARCH OF CRITICAL ANCHORAGE LENGTH PROBLEM OF ROD OF ANCHORAGE STRUCTURE
锚固类结构杆体临界锚固长度问题综合研究
7.
Application of Tunnel Anchorage with Anchor Rods to Anchor System of the Second Yangtse River Bridge in Wanzhou City
隧道式锚碇加锚杆在万州长江二桥锚固系统中的应用
8.
Apply Research of the Theory of Wholly Grouted Anchor Load Transfer Model;
全长粘结式锚杆传力模型及应用研究
9.
The Research about Detecting System Based on the ARM Microprocessor for Mining Anchor Bolt' Length
基于ARM的矿用锚杆测长系统研究
10.
Numerical Simulation of the Pullout Test of Wholly Grouted Cable
全长粘结式锚杆拉拔试验的数值实现
11.
The Technique Focus of Designing Anchor Fixed Length-critical Anchoring Length is Not Suitable for Upper-limit of Anchoring Length
锚杆锚固段设计的一个技术焦点—临界锚固长度不宜作为锚固长度上限
12.
Friction forces of earth acting on the anchor bar of bridge dais have been measured as long as20 h on the spot.
本文对锚拉桥台的锚拉杆进行了长达20小时的现场监测试验。
13.
Study on the Reinforcement Mechanism of Fully Grouted Rock Bolt Considering the Interaction between Bolt and Wallrock Mass
全长注浆岩石锚杆与围岩体相互作用下的锚固机理研究
14.
nuts of an anchor
有杆锚杆孔上下的杆箍
15.
Research for Mechanical Character and Dynamic Testing Property of Fully Grouted Bolt;
全长粘结式锚杆受力特征及动测特性研究
16.
Discussions on Ultrasonic guided wave test length of bolting
超声导波检测锚杆长度若干问题的讨论
17.
Analyzing and studying factors for determining neutral point position of fully grouted rock bolt
全长注浆岩石锚杆中性点影响因素分析研究
18.
Numerical analysis for effect of bolt length on stability of slopes
锚杆长度对边坡稳定性影响的数值分析