1.
The Study on Construction Techniques of Undermining the Multiple Risky Points Subway
多风险点地铁暗挖区间施工技术研究
2.
Application of Water Shutoff with Jet Grouting Pile in Subway Subsurface Excavation Section
旋喷桩堵水技术在地铁暗挖区间的应用
3.
Study on Surface Settlements Induced by Bored Shallow Tunneling of Subway
地铁区间浅埋暗挖施工的地表沉降特征
4.
Underground Excavation Construction of Metro Tunnel Based on Ground Freezing Method
基于冻结法的地铁区间隧道矿山法暗挖施工
5.
On common diseases of secondary lining of subway's subsurface tunnel and their control
地铁暗挖隧道区间二衬施工通病与控制
6.
Construction Technique Study on Metro Station and Running Tunnelling by Excavation in Watery Strata;
地铁车站和软弱富水地层暗挖区间隧道施工技术研究
7.
The Site-Monitoring Measurement and Analysing of the Sectional Tunnel of the Subway in Soft Stratum Abundant in Water;
地铁区间隧道软弱富水地层浅埋暗挖法施工监控量测与分析
8.
Construction techniques of crossing building on shallow buried tunnel of Shenzhen metro running
深圳地铁区间浅埋暗挖隧道穿越建筑物施工技术
9.
On construction technique of metro tunnel of subsurface excavation through building group
穿楼房群地段暗挖地铁隧道施工技术
10.
Study on Ground Surface Settlement Control during Tunnel Excavation of Metro Running Tunnel;
城市地铁区间隧道开挖的地表沉降控制研究
11.
Undermining Construction Technique Research on Suzhou Street Subway Station of Beijing City;
北京地铁苏州街站暗挖施工技术研究
12.
Undermining Construction Technique Research on Dongwuyuan Subway Station of Guangzhou City
广州地铁动物园站暗挖施工技术研究
13.
Construction technology of the ultra-shallow large span and subsurface excavation subway station
超浅埋大跨暗挖地铁车站的施工技术
14.
Application of a New Tubular Roof Method in Excavation Work of a Subway Station
NTR工法在地铁暗挖车站工程中的应用
15.
Construction Control of a Newly-Built Subway Station Undercrossing the Existing Subway Tunnel
暗挖地铁车站下穿既有地铁隧道施工控制
16.
Study on the Mechanics Characters of the Fabricated Linings in the Subway Constructed by Open-Cut Method;
地下铁道明挖区间装配式衬砌力学特性研究
17.
Numerical Modeling of Foundation Pit Excavation on Metro Tunnel
基坑开挖引起下卧地铁区间隧道上浮控制研究
18.
Computation and Analysis of Excavation Impact on Subway Interval Tunnel
基坑开挖对地铁区间隧道影响的计算分析