说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 二次衬砌厚度
1.
The Probability Distribution Rule of Highway Tunnel Concrete Construction Thickness and Reliability Analysis;
隧道二次衬砌厚度概率分布特征与可靠度分析
2.
Effect of lining thickness lack on lining safety for highway tunnel
公路隧道衬砌厚度不足对衬砌安全性影响
3.
Research on Critical Failure Vibration Velocity of Concrete Lining in Different Thickness Under the Acting of Blasting Vibration
不同厚度砼衬砌的爆破临界振速研究
4.
Undmage Tests & Probability Statistic of Strength on Tunnel Shotconcrete and Concrete Lining;
隧道喷混凝土和二次衬砌强度无损检测与概率与分布特征分析
5.
Influences of Fly Ash on Performances of Second Lining Concrete
粉煤灰对二次衬砌混凝土性能的影响
6.
Analysis of Secondary Lining Support Time and Load Distribution in Bi-arch Tunnel
联拱隧道二次衬砌的时机和荷载分析
7.
Construction Technologies for Secondary Lining of the Low Wall and Primary Filling of the Side Arch of Tunnel
隧道二次衬砌矮边墙与边拱一次灌注施工技术
8.
Finite element analysis on tunnel secondary lining with different coefficient of lateral pressure
不同侧压力系数隧道二次衬砌的有限元分析
9.
The Reason and Countermove against Reoccurring Lining Crack in Tunnels
公路隧道二次衬砌裂缝的成因与处治分析
10.
Optimization of Connection Rebar between Secondary Lining and Cable Duct in Highway Tunnels
公路隧道二次衬砌和电缆沟间连接钢筋的改进
11.
The Finite Element Analysis of Tunnel Secondary Lining Structural of Lingnan Freeway
岭南高速公路隧道二次衬砌结构有限元分析
12.
Analysis and Process on the Separation on the Top of Secondary Liner of Highway Tunnel
公路隧道二次衬砌顶部脱空的分析和处理
13.
The Surveillance and Study of Thermal-Creep Stress of the Thick Concrete Liners with Big Diameters during the Construction in the TGP;
三峡工程大洞径、厚衬砌混凝土施工期监测及温度徐变应力研究
14.
No Destructive Testing by GPR Method on Thickness of Concrete Channel Lining in the East Route of The South-to-North Water Transfer Project
南水北调东线渠道衬砌混凝土厚度GPR快速无损检测
15.
The Safety and Corrosion Study on the Concrete Lining of Xia men East Passage Subsea Tunnel;
厦门东通道海底隧道二次衬砌安全性及锈蚀行为研究
16.
Study on Secondary Support Design Method of Large Cross-Section Loess Tunnel in Zhengzhou-Xi An Passenger Dedicated Railway Line;
郑西客运专线大断面黄土隧道二次衬砌设计方法研究
17.
Research on Preparation Technology of Secondary Tunnel Lining Waterproof Fly-ash Concrete
隧道二次衬砌粉煤灰防水混凝土的配制技术研究
18.
Numerical Simulation Analysis of Removal of Temporary Supporting and Construction of Secondary Lining of Large-span Tunnel
大跨隧道临时支护拆除及二次衬砌施工数值模拟分析