1.
Optimization of parameters when practising multi unit and muti step stage room mining method
多单元多步骤阶段矿房采矿法参数优化
2.
Distribution structure and parameter determination of medium-length holes in stage room mining method
阶段矿房采矿法中深孔布置结构及参数的确定
3.
Discussion on Anti-sulfuration Dust Explosion Measurement in Multicell and Multi-process Phase Mining
多单元多步骤阶段矿房采矿法防硫化矿尘爆炸措施的探讨
4.
On Application of Sublevel Drilling and Stope Mining Method in Mining Thin Lode of Shouyun Iron Mine
分段凿岩阶段矿房法在首云铁矿薄矿脉开采中的应用研究
5.
STUDY ON STABILITY OF STOPE IN ROOM HIGH-LEVEL LARGE-DIAMETER LONGHOLE MINING IN ANQING COPPER MINE
安庆铜矿矿房高阶段大直径深孔采矿采场稳定性研究
6.
THE HIGH BENCH LONG HOLE MINING IN ANQING UNDERGROUND COPPER MINE
安庆铜矿高阶段大直径深孔采矿法实施方案
7.
triple-entry room-and-pillar mining
三进路房柱式采矿法
8.
sublevel blast-hole method
深孔分段崩落采矿法
9.
Optimization Design of Ore Accumulating Trench by Sublevel Open Stoping
分段空场采矿法聚矿堑沟的设计优化
10.
Experimental Research on Small Segment Caving Mining Method in Qianhe Gold Mine
前河金矿小分段崩落采矿法试验研究
11.
pillar robbing
【采矿】回收矿柱法
12.
The Application of Digital Simulating Method in the Optimization on Mining System Design of Block Stoping;
阶段空场法采矿系统设计优化的数值分析方法及应用
13.
Mining design procedures of the deep mining process sublevel caving stoping method
无底柱分段崩落采矿法回采设计方法
14.
Study on the Overall Mining Technique for the Untouchable Orebody at Jile Ore-Section;
极乐矿段难采矿体采矿综合技术研究
15.
The area in a mine from which the mineral deposit is being or has been removed is stope. This is the productive area of a mine.
井下正在开采或已采完的矿段叫矿房。这是井下的生产区。
16.
Application of Room and Pillar Mining Method in Under-sea Deposit
分矿房矿柱分层充填法在海底开采中的应用
17.
An Analysis of Management of Ceiling Boards of Mining Way in House-post of Dounan Mine
斗南矿区房柱采矿法顶板管理问题初探
18.
Similar Experiment of High-Level Large-Diameter Long-Hole Mining in the Anqing Copper Mine
安庆铜矿高阶段大直径深孔采矿相似材料模拟实验