1.
Comprehensive Construction Techniques for Settlement Control of Xuanwumen Metro Station Crossing Underneath Existing Metro Station on No.4 Line of Beijing Metro
北京地铁四号线宣武门站下穿运营车站沉降控制综合施工技术
2.
Investigation on Construction Technology and Security of Underpassing Metro Station Crossing Railway Ground;
地铁车站下穿铁路站场施工技术与安全性研究
3.
Research on Protection Schemes for Railway Station in Shield Construction
盾构隧道下穿火车站站场保护方案的探讨
4.
Deformation Analysis of an Existing Subway Station Structure Traversed Down by a Large Shield Tunnel
大直径盾构隧道下穿既有车站诱发车站结构变形分析
5.
B: You get off at the next stop, cro the street, and you'll find the stop not far on your right hand side.
您可以在下一站下车,穿过街道,在右边不远处,您会看见站台。
6.
MONITORING MEASUREMENT AND SAFETY ANALYSIS FOR CONSTRUCTION OF TUNNEL BENEATH PASSENGER TRANSFERRING SUBWAY STATION IN BEIJING
隧道下穿地铁拟换乘车站施工监测与安全分析
7.
COMPARATIVE STUDY ON SIMULATION METHOD OF STATION PASSAGEWAY PASSING THROUGH UNDER TUNNEL SHIELD
隧道盾构下穿车站出入口仿真方法对比研究
8.
RESEARCH ON INFLUENCE AND MONITORING OF SHIELD TUNNEL OBLIQUELY CROSSING BENEATH EXISTING SUBWAY STATION
盾构隧道斜交下穿地铁车站的影响与监测研究
9.
Comparative Simulation Analysis on Structural Safety of Metro-station with Shield Tunnel being Constructed Below
隧道盾构下穿车站出入口数值仿真对比研究
10.
Numerical Simulation of Shield Tunnel Passing under the Existing Subway Station
盾构隧道近接下穿既有地铁车站的数值模拟
11.
Construction Control of a Newly-Built Subway Station Undercrossing the Existing Subway Tunnel
暗挖地铁车站下穿既有地铁隧道施工控制
12.
Study on Undercrossing Existing Metro Station Construction Scheme of Beijing Metro Line 4 Xuanwumen Station
北京地铁四号线宣武门站下穿既有车站施工方案研究
13.
Influences on the Station Architecture Design by Sectional Transport and Through Transport
关于贯通运营与分段运营对车站建筑设计的影响
14.
Security analysis of running metro station structure adjacent to foundation excavation
邻近基坑开挖的运营地铁车站结构安全度分析
15.
Analysis of the Surface-induced Distortion of Running Subway Caused by Under-crossing Shield
盾构下穿越已运营隧道的地表变形实测分析
16.
I'm getting off (ie leaving the train) at the next station.
我下站下(火车).
17.
The passenger cars will be sealed. Garbage on the trains will be collected in plastic bags which will be handed over to stations along the plateau for batch treatment.
客车采用封闭式车体,车上垃圾装袋,运至高原下交车站集中处理。
18.
Research on the Effection and Deformation Control of Double-line Tunnel Undercrossing Existing Subway Station
双线暗涵近距离下穿既有地铁车站的影响及变形控制研究