说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 等风险图
1.
Application of Equal Risk Curve to Risk Assessment of Engnerring Projects;
等风险图法在工程项目风险评价中的应用
2.
Bidding risk analysis based on equal risk curve and fuzzy comprehensive evaluation method
基于等风险图和模糊综合评价法的投标报价风险分析
3.
Including risk, risk subject, risk factor, risk object, state of risk, risk event etc.
包括:风险,风险主体,风险因素,风险客体,风险状况,风险事件等。
4.
aware of the risk, danger, threat, etc
觉察到风险、 危险、 威胁等
5.
Risk includes the six elements of risk source,risk object,risk subject,risk standard,risk assessment,risk tendency.
风险包含风险源、风险客体、风险主体、风险标准、风险评价、风险走向等六大要素。
6.
Risk Compensatory Mechanism: Risk-taking and Equivalent Responsibility;
风险补偿机制:风险分担与责任对等
7.
Especially it analyses changes: the stockpile risk into the arrear risk, operation risk changes market risk, and credit risk into finance risk.
特别是库存风险转化为挂帐风险,经营风险转化为市场波动风险,信贷风险转化为财政风险等;
8.
Initial-issue underwriting risk includes policy risk, issuer risk, bought-deal risk.
证券公司的新股承销业务面对的风险主要有政策风险、发行人风险、包销风险和信用风险等;
9.
Application of Time-risk Diagram in the Risk Decision of EMV and EUV;
“时间—风险”图像在EMV与EUV风险决策中的应用
10.
His best known works are Swimming Fish and Waving Bamboo in the Wind.
他的作品有《游鱼图》、《潇湘风竹图》等。
11.
In this thesis, the authors are trying to look into the main risks that our life insurance companies confront.
我们试图通过对我国目前寿险公司面临的主要风险(营风险、为风险)行分析。
12.
Risk Management of Web Resources Preservation in Library;
图书馆网络信息资源保存的风险管理
13.
Features and Risk-controlling of the Catalogue Outsourcing of Library;
图书馆编目业务外包特点与风险控制
14.
Goal-oriented modeling of IT project risk structure using influence diagram;
目标导向的IT项目开发风险影响图模型
15.
Planning Exploit Graph Model for Information Security Risk Process
信息安全风险过程的规划渗透图模型
16.
Research on the Main Risk Types of Intellectual Property in Library
图书馆知识产权风险的主要类型研究
17.
Analysis on the Factors Affecting Intellectual Property Risks in Library
图书馆知识产权风险的影响因素分析
18.
face the perils of the ocean,ie storm,shipwreck,etc
面对海上的危险(风暴、船只失事等)