1.
Application and Effect of Combined Cycle Fuel Gas-Steam Turbine in Liangang
燃气-蒸汽联合循环发电在涟钢的应用及效果
2.
Investment and Benefits Analysis of Jinan Steel Gas and Steam Combined Cycle Power Generation Item;
济钢燃气-蒸汽联合循环发电项目投资及效益分析
3.
Configuration scheme with homemade protections for 9FA gas-steam combined-cycle generator-transformer unit
9FA型燃气-蒸汽联合循环发电机组的国产保护设备配置方案
4.
combined steam and gas cycle
蒸汽-燃气联合循环
5.
Gas and steam Combined Cycle ?
燃气一蒸汽联合循环
6.
Exergy Analysis for Combined Cycle of Shenzhen Qianwan Power Plant
深圳某电厂燃气-蒸汽联合循环分析
7.
Realize localization of IGCC generator unit and heavy gas turbine.
实现大型燃气—蒸汽联合循环发电机组、型燃气轮机国产化。
8.
Cogeneration Optimal Configuration of Gas-Steam Combined-Cycle Power Plant;
燃气—蒸汽联合循环电厂热电联产的优化配置
9.
Study and Design of the BFG Gas Compressor Used in the Gas-evapour Combined Cycle Power Plant Unit
燃气蒸汽联合循环发电装置用煤气压缩机的设计
10.
Study on Operation-optimization of Gas-Steam Combined Cycle Plant Unit;
燃气—蒸汽联合循环电站机组运行优化研究
11.
The Research of Repowering the Old Power Plant by Gas Turbine Combined Cycle;
利用燃气—蒸汽联合循环改造老电厂的研究
12.
Analysis of fire protection project in gas-steam combined cycle power plant
燃气—蒸汽联合循环发电厂消防设计几个问题的分析
13.
Software Development on the Performance On-line Monitoring of Gas/steam Combined Cycle;
燃气—蒸汽联合循环在线热力性能监测软件开发
14.
MAINTENANCE STRATEGY OF LARGE-CAPACITY GAS-STEAM COMBINED CYCLE UNIT
大型燃气-蒸汽联合循环机组维修策略
15.
Research on layout scheme of gas turbine combined cycle units
燃气-蒸汽联合循环机组布置方案研究
16.
Operation of a M701F Single Shaft Gas-Steam Combined Cycle Unit
M701F单轴燃气-蒸汽联合循环机组的运行
17.
Vision of Building Gas-Steam Combined Cycle Cogeneration PowerPlant in Nanjing
在南京建设燃气-蒸汽联合循环热电联产电厂的设想
18.
The Thermal Economics Analysis of Gas Steam Combined Cycle and Its Combined Cooling, Heating and Power;
燃气—蒸汽联合循环及其热电冷三联供的热经济学分析