说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 内消能泄洪洞
1.
Research on Barrage Effect for Level Rotary Internal Energy Dissipation Discharge Tunnel;
水平旋流内消能泄洪洞的阻塞效应研究
2.
Numerical Simulation of Level Swirling Flow of Inner Energy Dissipation Discharge Tunnel;
水平旋流内消能泄洪洞水力特性的数值模拟
3.
Numerical Simulation of Level Swirling Flow of Inner Energy Dissipation Discharge Tunnel with Shaft Inlet
竖井进流水平旋转内消能泄洪洞的数值模拟
4.
Model Test and Numerical Simulation for Swirling Flow of Inner Dissipator with Shaft Inlet;
竖井进流水平旋转内消能泄洪洞试验研究与数值模拟
5.
Structure Optimizing and Project Augmentation for Internal Dissipation Discharge Tunnel with Swirling Flow Reconstructed from Diversion Tunnel of Gongboxia Power Station;
公伯峡水电站导流洞改建为旋流式内消能泄洪洞的体型优化与方案比较研究
6.
Theoretical expression ot the wall shearing stress has been deduced for the level rotary flow in an internal energy dissipation tunnel.
本文推导了水平旋转内消能泄洪洞空腔环流壁面切应力的理论分析表达式。
7.
The trajectory bucket is improved and optimized for suitable trajectory distance and small scouring.
泄洪洞挑流坎挑流消能时,当泄流量较小时,挑距较短。
8.
Study on Outlet Energy Dissipation and Structure of Spillway Tunnel at Si'anjiang Reservoir Multipurpose Project Supplying Water to the Lijiang River in Guilin
桂林漓江补水思安江水库泄洪洞结构与出口消能设计研究
9.
Experimental Study on Energy Dissipation of Flood Discharge for Upper Hole of Double-curvature Arch Dam of Donghe Reservoir
洞河水库双曲拱坝表孔泄洪消能问题的试验研究
10.
Research on the image measurement method for bubble motion in spillway tunnel
泄洪洞内气泡运动的图像测量方法研究
11.
The Hydraulic Model Test on Outlet Works and Energy Dissipation for Chardara Hydropower Station;
Chardara水电站泄洪消能模型试验研究
12.
Numerical Simulation and Experiment Study on Flood Discharge and Energy Dissipation of High Dam with Large Discharge
高坝大流量泄洪消能数值模拟及实验研究
13.
Optimization for Layout of Flood-release Structures and Energy-dissipators for High Arch Dams;
高拱坝坝身泄洪与消能建筑物的优化布置
14.
Experiment Research and Numerical Simulation on Flow Field of Discharge from Surface-Bottom Outlet on Low Waterhead and Big Flux;
低水头大流量厂坝联合泄洪消能流场的研究
15.
Discussion on energy dissipation design for hydropower station at high head and large discharge
大流量高水头水电站泄洪消能设计的探讨
16.
Concrete construction management in reconstruction of energy dissipation structures of Hongshi dam
红石大坝泄洪消能工改造工程混凝土施工管理
17.
Safety management in reconstruction of energy dissipation structures of Hongshi dam
红石大坝泄洪消能工改造工程安全管理
18.
Control of explosion in reconstruction of energy dissipation structures of Hongshi dam
红石大坝泄洪消能工改造工程爆破施工控制