1.
Study of Placing Prestressed Reinforceing Steel Bar of Deposition Pool
整体现浇预应力混凝土沉淀池布筋方法研究
2.
The cast-in-place rib of whole board produces the reason of the crack and treatment method;
整体现浇楼板产生裂缝的原因及处理方法
3.
Key Technique of A Few Supported-point Brackets in Integrated Cast-in-site Construction of Overpass Bridge
少支点支架在跨线桥整体现浇施工中的关键技术
4.
Construction Technology of Cast-in-place Box Girder Steel Framework Integral Lifting
现浇箱梁钢筋骨架整体吊装施工技术
5.
On the crack cause of integral cast-in-site floor and its prevention and control
现浇整体式楼盖板裂缝的产生与防控
6.
Brief statement on general constructional skill of cast-in-place continuing box-beam
简述现浇连续箱梁整体施工技术要点
7.
Integral Translation of Scaffolding for Cast-in-Situ Concreting of Box Girders of South Approach Spans of Sutong Bridge
苏通大桥南引桥箱梁现浇支架整体平移施工
8.
Integral Cast in Place Method Used in Hollow-Core and Non-Beam Slab Construction
整体式现浇混凝土空心无梁楼盖在工程中的应用
9.
Technical specification for integralpouring antistatic terrazzo floor
整体浇注防静电水磨石地坪技术规程
10.
Large Area Integral Concreting Technology in Concrete Structure Construction;
大面积混凝土结构整体浇筑施工技术
11.
The Concrete Continuous Box Girder Top Surface Flatness Control
混凝土现浇连续箱梁顶面平整度控制研究
12.
Study of Calcining Entire?Cast Furnace Lid Made with Mullite?Fly Ash
莫来石—粉煤灰整体浇注焙烧炉盖的研究应用
13.
FINITE ELEMENT ANALYSIS OF TEMPERATURE STRESS OF CPR1000 NUCLEAR POWER PLANT RAFT WITH DIFFERENT POUR THICKNESS
CPR1000核电站基础多层整体浇筑可行性有限元分析
14.
The cover soil pot room raft plank foundation and shear wall whole sprinkle
覆土罐室筏板基础与剪力墙的整体浇筑
15.
THE TECHNOLOGY OF ASSEMBLED FIELD-CAST CONCRETE WALL WITHOUT DEMOULDING
拼装式现浇混凝土墙体免拆模板技术
16.
On the two-sided casting construction technique of the wall concrete of CL structure system
CL结构体系墙体混凝土双面现浇施工工艺探讨
17.
Optimization design for mould plate and support system of reinforced concrete wall
现浇钢筋混凝土墙模板及支撑体系的优化设计
18.
The Theoretic Study on Thin-wall Core Box Cast-in-site Prestressed Concrete Hollow Floor System;
现浇预应力薄壁箱体空腹楼盖的理论分析