说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 无坝取水渠首
1.
Elementary Analyse Muddy and Sandy River Noembankment Channel Water the Head of Channeland Channel of River Prevention and Cure Measure
浅析多泥砂河流无坝取水渠首及其河道整治措施
2.
The Discovery ot the Dam of Zhengguo Canal of Qin Dynasty and its Architectural Characteristics at the Starting Part
秦郑国渠大坝的发现与渠首建筑特征
3.
head gate structure [irrigation]
渠首闸门,总水闸门[灌溉]
4.
an irrigation scheme with dams, reservoirs, and channels.
有水坝、水库和水渠的灌溉系统
5.
Preliminary Studies on the Depth Selection of Seepage Calculation on the Infinite Deep Pervious Foundation
大坝无限深透水地基渗流计算深度选取初探
6.
The Research of Danjiangkou Dam Heightening Project on the Impact of Headwork County--Xichuan
丹江口大坝加高工程对渠首县淅川的影响研究
7.
This system had been applied to strobe engineering of tongjiyan and run well.
该系统已经在通济堰渠首取水工程闸门工程中投入使用,取得了良好的运行效果。
8.
Study on Management Information System of Water Resources in Dongfeng Canal Head;
东风渠渠首水资源调度管理信息系统研究
9.
Today, excess water is channeled into reservoirs and power hydro-electric dams.
今天,多余的水通过渠道引进水库和发电大坝。
10.
Study on "Diversion Angle Effect" of Lateral Intake Flow;
明渠岸边侧向取水的“取水角效应”研究
11.
Talking about the Concrete Quality Control of Canal Head Power Station and Canal Head Pump Station of Zhangfeng Reservoir Project
浅述张峰水库工程渠首电站和渠首泵站的混凝土质量控制
12.
The Discussion of Optimal Allocation of Water Resource of Dujiangyan Irrigation System Canal Head;
都江堰灌区渠首水资源优化配置研究
13.
Analysis on Numerical Simulation and Investigation of Reinforcement Method of New-old-structure Interfaces in Gate Engineering;
渠首加闸工程新旧坝体结合面数值仿真分析与加固措施研究
14.
Study on the Siltation at Upper Reaches of the Headwork Hub of Hengpaitou in Pishihang Irrigation Area;
安徽省淠史杭灌区横排头渠首枢纽坝前淤积浅析
15.
In combination with the construction practice of Xinba Lock, this paper introduces culvert construction of tile Lock's upper lock head and preventive measures for cracks.
通过新坝船闸施工实践,介绍了船闸上闸首输水廊道施工及预防裂缝产生所采取的措施。
16.
Study of RCC Arch Dam Structure of Longshou Hydropower Project;
龙首水电站碾压混凝土拱坝结构研究
17.
Behavior of Laxiwa Ach Dam in the Period of First Impounding
拉西瓦水电站首次蓄水期拱坝主要性态综述
18.
Application of Genetic Algorithm on Distribution of Water Resources in Dujiangyan Canal Head;
遗传算法在都江堰渠首配水中的应用研究