说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 白鹤滩库区
1.
Debris flow disaster and its controlling measures at Heishui Gully in the Baihetan reservoir area on the Jinsha River
金沙江白鹤滩库区黑水河泥石流及其防治对策
2.
Research on Entironment and Discharge to Dazhai Gully and Haizi Gully Debris Flows in Baihetan Reservior Area, Jinsha River;
金沙江白鹤滩水电站库区大寨沟、海子沟流域泥石流形成环境与流量研究
3.
A Study on GIS-Based Hazard Assessment about Geological Hazard of Dazhai Gully and Haizi Gully in Baihetan Reservior;
基于GIS的白鹤滩水电站库区大寨沟、海子沟流域地质灾害危险性评价研究
4.
Study on the Jenesis and the Engineering Properties of Interlayer and Interal Staggered Zones in Baihetan Hydroeletric Power Station Dam
白鹤滩水电站坝区层间层内错动带成因及工程性状研究
5.
Vigilance Behavior of Grus monacha in Dongtan Nature Reserve of Chongming,Shanghai
崇明东滩自然保护区越冬白头鹤警戒行为的观察
6.
Study on Linear Programming Simulation of Water-rock Reaction of Basalt at the Dam Area of Baihetan Hydropower Station
白鹤滩水电站坝址区玄武岩水—岩作用线性规划模拟研究
7.
Imitation of water-rock reactions of basalt and its application in the dam site area of Baihetan hydropower station
白鹤滩水电站坝址区玄武岩水—岩作用模拟及应用研究
8.
A Model for Water-Rock Reactions and Its Application of the Basalt in the Dam Area of Baihetan Hydropower Station
白鹤滩水电站坝址区玄武岩水-岩作用模拟及应用研究
9.
Engineering Rock Mass Classification of Bai Hetan Hydroelectric Station at JinShaRiver
金沙江白鹤滩电站工程岩体质量分类
10.
Baihetan Hydropower Project on Jinshajiang River and timing of project construction;
金沙江白鹤滩水电站工程建设时机的选择
11.
Study on the Stability of Engineering Slope of Baihetan Hydroelectric Power Station
金沙江白鹤滩水电站工程边坡稳定性研究
12.
Overload Research of Topography Asymmetry on Baihetan Arch Dam
地形不对称对白鹤滩拱坝超载能力的影响研究
13.
Study of evolutional simulation of Baihetan river valley and evaluation of engineering quality of jointed basalt P_2β_3
白鹤滩河谷演化模拟及P_2β_3玄武岩级别评估
14.
Installation procedure research for radial service gate at discharge tunnel of Baihetan Hydropower Station
白鹤滩水电站泄洪洞工作弧门安装工艺研究
15.
Study on the Uniformity of Heterogeneous Aggregate Concrete of Baihetan Hydropower Station
白鹤滩水电站复杂岩性骨料混凝土均一性研究
16.
Engineering Geological Feasibility Study of High Arch Dam Construction at Baihetan Hydropower Station, Jinsha River;
金沙江白鹤滩水电站高拱坝建设工程地质适宜性研究
17.
Study about the Deformation Properties of the Columnar Joints Basalts for the Foundation of the High Arch Dam of Baihetan Hydropower Station Jinsha River;
金沙江白鹤滩水电站高拱坝坝基柱状节理玄武岩变形特性研究
18.
Baihe Jinsha River Hydropower Station Columnar Joints Basalts Rockmass Structural and Quality Classification;
金沙江白鹤滩水电站柱状节理玄武岩岩体结构及质量分级研究