1.
Study on Influence of Knock Down Times on Mechanical Properties of Screw-jointed Wood/Plastic Structure
拆装次数对螺钉连接的木塑构件机械性能的影响
2.
Packet assembly/disassembly facility(PAD) in a public data network
公用数据网中的分组装拆设施
3.
Packet assembly/disassembly facility in a public data network
GB/T11591-1989公用数据网中的分组装/拆设施
4.
Disassembly and Assembly Simulation Design for the Reduction Gear;
减速器拆装的仿真设计——Visual Basic.NET二次开发AutoCAD
5.
Hierarchy-invariant Interactive Virtual Maintenance Model and Its VRML-based Simulation
层次约束关系不变的虚拟拆装模型及其VRML实现
6.
terminal devanning
(集装箱)区内拆箱
7.
calibration factor of the primary device
一次装置的校准系数
8.
The average weight of payload of container is one of important parameters for calculating the capacity of container operation in the freight stations such as container terminal, railway or road container stations.
集装箱平均货物重量是设计计算集装箱码头、路和公路集装箱场站拆装箱库容量的重要参数。
9.
Numerical Simulation Analysis of Removal of Temporary Supporting and Construction of Secondary Lining of Large-span Tunnel
大跨隧道临时支护拆除及二次衬砌施工数值模拟分析
10.
Generator/Vacuum Pump Remove/Install
发电机/真空泵拆卸/安装
11.
prefabricated or sectional building
装配式或拆卸式房屋
12.
Door Module Remove/Install
车门模组拆卸/安装
13.
RKE Receiver Remove/Install
RKE接收器拆卸/安装
14.
Demister Duct Remove/Install
除雾器管拆卸/安装
15.
Glove Box Remove/Install
手套箱的拆卸/安装
16.
Remove left cowl side trim panel.
拆下左仪表板侧装饰板。
17.
working with unassembled metal shelving.
制造可拆装的金属架
18.
Separate the B-pillar trim from the B-pillar.
从B-柱中拆下B-柱装饰。