1.
On Construction Security in Remoulding Oil Production Stations
石油生产场站改造中的施工安全问题
2.
Discussion on modification of CSP rolling station yard
薄板厂投产轧钢站车场改造方案探讨
3.
The practice of field management for 500 kV Doushan Substation retrofit is presented.
介绍了斗山变电站改造现场管理方面的做法。
4.
Railway Yard Transformation Construction and Excessive Plan Optimization Discussion
铁路站场改造施工及过渡方案优化探讨
5.
URBAN RENEWAL AND CULTURAL CENTRE, LIBRARY, RIVERSIDE PARK, BUS STATION, PLAZA,QUARRATA, ITALY, 2004
城市改造及文化中心、图书馆、河畔公园、车站、广场,夸拉塔,意大利
6.
Grouting test at the rock plug intake and solutions for main problems in reconstruction of Changdian hydropower station
长甸电站改造工程岩塞进水口现场灌浆试验和主要问题及处理
7.
To eliminate the risks associated with chlorine storage, on-site hypochlorite generation plants have replaced gas chlorination plants at sea water pumping stations.
为消除储存氯气的危险,当局已把海水抽水站的加氯装置,改为场内制造氯酸盐装置。
8.
meadow the old orchard
把旧果园改造成牧场
9.
The Research of Reformation and Renewal in Major Passenger Railway Station in China;
我国大型铁路客运站站房改造与更新设计研究
10.
Modification of GW5 Disconnector for 110kV Switchyard of Fushi Hydropower Station in the Rongjiang River
融江美亚浮石电站110kV开关站GW5隔离开关改造
11.
The Research of the Reconstruct Project on Operation Optimization of Water Injection Pumping Station;
油田注水泵站优化运行改造方案研究
12.
Reliability Analysis of Reconstruction and Enforcement on Power Station Boiler Steel Frame;
电站锅炉钢结构改造加固可靠度研究
13.
Research on Strategy and Technology of Large Scale Pumping Station Technique Improvement;
大型泵站更新改造策略及技术的研究
14.
Integrated Automatic System Reconstruction Project of 220kV Substation;
220kV变电站综合自动化系统改造工程
15.
Technical Alteration of the CT-40 Mechanical Hydraulic Governor in the Shitouhe Hydropower Station;
石头河水电站CT-40型调速器技术改造
16.
Views on Improving Construction Safety in Gas Stations Modification;
加油站改造施工中的安全监督与管理
17.
Research on the Alteration of Excitation Regulator in Yangling Hydropower Station;
杨凌水电站励磁调节装置的改造浅析
18.
Issues for attention in renovation of pillar-less rainsheds for large scale passenger stations;
大型客站无柱雨棚改造应注意的问题