1.
Hong Yangang Brdge Discussion on the Construction Technique of Cast-in-Place Prestressed Concrete Continuous Box-Girder
红岩岗大桥现浇预应力混凝土连续箱梁施工技术
2.
On construction technology of suspending irrigated variable cross-section prestressed continuous box-girder bridge
悬浇变截面预应力混凝土连续箱梁桥施工技术
3.
The Design and Prefabrication of the Support Steel Pipe Scaffold for Cast-in-situ Prestressed Continuous Box Beam
预应力混凝土连续箱梁现浇段组合式高支架设计及施工技术研究
4.
Construction and quality control of the cast-in-place prestressed concrete continuous beam
现浇预应力混凝土连续梁施工及质量控制
5.
The Construction Technique of Prestress Concrete Continuous Box Beam Close-up Section
悬臂浇筑预应力混凝土连续箱梁合拢段的施工技术
6.
Application of entire hall girder in construction of castin-place concrete continuing box beam
现浇混凝土连续箱梁施工中满堂式支架的应用
7.
Test Research into the P.C. Continuous Curved Box Girder Bridge;
预应力混凝土连续弯箱梁桥试验研究
8.
Reinforcement of Prestressed Concrete Curved Box Girder Bridge
某预应力混凝土曲线连续箱梁桥加固
9.
Construction of the prestressed concrete continuous box beam cantilever casting
预应力混凝土连续箱梁悬臂灌注施工
10.
Crack Disease of Prestressed Concrete Continuous Box Girder
预应力混凝土连续箱梁裂缝病害分析
11.
Cast-in-place Reinforced Concrete Pre-stressed Box's Construction Quality Control
现浇钢筋混凝土预应力箱梁的施工质量控制
12.
Analysis of thermal stress for prestressed concrete continuous box-girder bridges
预应力混凝土连续箱梁桥的温度应力分析
13.
Temperature Gradient Analysis of Long-span Prestressed Concrete Box-girder Bridge;
大跨径预应力混凝土连续箱梁桥温度效应分析
14.
Study on Side Reaction of Prestressed Concrete Continuous Curve Box Girder Bridge;
预应力混凝土连续曲线箱梁桥侧向效应研究
15.
Analysis of the temperature effect on pre-stressed curve concrete continuous box girder
预应力混凝土曲线连续箱梁温度作用效应分析
16.
The Concrete Continuous Box Girder Top Surface Flatness Control
混凝土现浇连续箱梁顶面平整度控制研究
17.
Analysis and Discussion on Control Measures to Concrete Cracks in Cast-in-place Continuous Box Girder
现浇连续箱梁混凝土裂缝控制措施分析探讨
18.
Analysis of Bottom Slab Crack under the Anchorage of P.C.Continuous Box Girder
预应力混凝土连续箱梁底板锚下裂缝分析