说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 双线整孔箱梁
1.
Beixiang beam line factory 32 m whole bore box beam preparing technique
北乡制梁场32m双线整孔箱梁预制技术
2.
Prefabrication Technology of Double-track Monolithic Box Girder in Wuhan-Guangzhou Passenger Special Line
武广客运专线双线整孔箱梁预制技术
3.
On the construction technology of the erection of the double line box girder along the Beijing-Shanghai railway express
京沪高铁双线整孔箱梁架设施工技术
4.
Non-loading crack control of the double track monolithic box girder of the passenger dedicated line
客运专线双线整孔箱梁非荷载裂缝控制
5.
Construction technology of railway passenger dedicated line two-hole box full of prefabricated
铁路客运专线双线整孔箱梁预制施工技术
6.
Construction Techniques for Double-track Full-span Box Girder Erection in Shitai PDL
石太客运专线双线整孔箱梁架设施工技术
7.
Construction sequence and cost analysis of 24m double line box girders erected at tunnel portal by JQX900 bridging machine;
JQX900型导梁式架桥机隧道口架设24m双线整孔箱梁施工工序及成本分析
8.
The Technique of MSS Applying in Creation of Bridge Structured of 32 m Box-beam for Double Lined PDL
客运专线双线32m整孔箱梁移动模架造桥技术
9.
Precasting and Installation of the Double-Track Simply Supported Monolithic Box Beams of High-Speed Railroad;
高速铁路双线整孔简支箱梁的预制和安装
10.
Control factors,engineering measures and computation of time limit of full span double-tracked simple box girder transport;
整孔双线简支箱梁运输控制因素及工程措施和工期计算
11.
Construction Technology for 32m Whole-span Box Girder Erection in Passenger Dedicated Line
客运专线32m整孔箱梁架设施工技术
12.
The Installation Techniques for 900t Box Beams for Passenger Railway
客运专线900t整孔箱梁架设施工技术
13.
Research on Construction Technology of Integrated Span Simple Support Girder for Qinhuangdao-Shenyang Passenger Dedicated Railway;
秦沈客运专线整孔简支箱梁施工技术研究
14.
Research on the Temperature Control for Stream Maintenance of 32 m Box Girder for Passenger Dedicated Line in Winter
客运专线32m整孔箱梁冬季蒸气养护温度控制研究
15.
Study of indexes of continuous girders (double track line) erected with cast-in-place cantilever method;
悬浇连续箱梁(双线)梁部指标的研究
16.
Construction Technology on Integral Span Box Girder Fabrication and Erection;
铁路40米PPC箱梁整孔制造与架设技术
17.
Scheme comparisons and selections of simple box girder fabricating yard of the passenger dedicated lines
客运专线双线简支箱梁梁场建设方案比选
18.
Cost analysis of 24m double track box girders erection by bridging machine;
架桥机架设24m双线箱梁费用分析