说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 坝前水位
1.
The prediction method of the water lever rising on Fushui reservoir dam of Fushui river
富水流域富水坝前水位涨幅的预测方法探讨
2.
Research on Technology of Increasing Dam Height on Sludge before Dam of Datankou Reservoir
大滩口水库坝前淤泥面加坝技术初探
3.
Treatment for cracks and displacement on upper dam of Lushuihe Hydropower Station
绿水河水电站上坝坝体裂缝及位移事故处理
4.
The Research of Hydrodynamic Pressures on Dams in Earthquake of RCC Gravity Dam;
碾压混凝土重力坝地震坝前动水压力研究
5.
Predicting the horizontal displacement of a dam is of great importance for its safety.
预测大坝水平位移对于大坝安全来说非常重要.
6.
The water level in the reservoir is low because of the long drought .
因为久旱,水坝的水位非常低。
7.
The deformation of dam is a three-dimension value including horizontal and vertical displacement.
水坝变形是包括水平位移和垂直位移的三维量。
8.
So thehorizontal displacements of a dam are normal as a whole.
因此,大坝水平位移变化总体上正常。
9.
The Impact of Sight Rubber Dams on Groundwater Levels of Huangshan City
黄山市景观橡胶坝对地下水位的影响
10.
Excel Application in Dam Positioning Measurement
Excel应用程序在水坝定位测量中的应用
11.
Numerical Simulation of Hydraulic Scouring of Silt in Front of Qingtongxia Reservoir Dam;
青铜峡水库坝前淤积体水力冲刷的数值模拟
12.
Horizontal Displacement Observation Upon a Reservoir Dam and Its Accuracy Analysis
岳城水库大坝水平位移观测和精度分析
13.
Evaluation and Deformation Analysis on horizontal Displacements of the Dam of Baogang Waterleading Reservoir
宝钢引水库大坝水平位移监测评价和变形分析
14.
Downstream water level harnessing scheme for Shuikou Hydropower Station
福建闽江水口枢纽坝下水位治理工程方案研究
15.
Analyze on Development Prospects of 300 m Level Ultra-high CFRD from Shuibuya High CFRD
从水布垭高面板堆石坝看我国300m级超高面板堆石坝的发展前景
16.
Some Problems on Observation Design of Vertical Displacement at the Gezhouba Large Dam
葛洲坝水利枢纽大坝垂直位移观测设计的几个问题
17.
Influence of dam displacement and internal water pressure on the structural stresses of penstock laid on downstream face of dam
坝体变位和内水压力对坝后背管结构应力的影响
18.
dam:To hold back or confine by means of a dam.
"用水坝阻止,用水坝限制"