1.
Temperature observation and simulation analysis during construction period for base plate of intake tower
进水塔底板混凝土施工期温度观测与ANSYS仿真分析
2.
bilge board
(船底)活水道盖板
3.
Stressed Analysis Forced on Base Plate of Iron Tower's Leg by Draw Stress
铁塔塔脚脚底板拉应力作用下的受力分析
4.
The Study on the Internal Forces in the Big Raft of Multi-Tower Structure;
多塔楼结构大底板的内力分析和研究
5.
Research and Analysis of Pump House Ledger Wall of the Vertical Axial Flow Pumping Station with Elbow Type Inlet Passage by FEM;
立式轴流泵站肘形进水流道泵房底板有限元分析研究
6.
Study on the Dynamic Monitoring System of the Destroy of the Bed Plate and the Water of the Bed Plate;
采场底板破坏及底板水动态监测系统研究
7.
The grouting reconstruction technique of lower confining bed can be used to control the water hazard from coal floor.
煤层底板含水层注浆改造技术可以彻底根治底板水害。
8.
A Study of Santana Drum Brake Back Plate Vibration Modality
桑塔纳轿车鼓式制动器制动底板振动模态研究
9.
Second-order analysis on the large-chassis-mount multi-tower structure with consideration of floor deformation
考虑楼板变形时大底盘多塔结构二阶分析
10.
Evaluation of perforated trays(Ⅱ)--models of perforated tray modified with FRI data
网孔塔板的评价(Ⅱ)——用FRI数据改进网孔塔板设计模型
11.
Research and Improvement on the Structure of New Vertical Sieve Tray;
新型垂直筛板塔结构改进及性能研究
12.
Application of Excel in calculation of distillation column stage by stage
运用Excel对精馏塔进行逐板计算
13.
bilge board scow
一种装有舷侧披水板的平底浅水赛艇
14.
Study on the Floor Water Invasion Regularity Mining on the Top of Water-pressured;
承压水体上开采底板突水规律的研究
15.
A consolidating technology of pouring starch into bottom board to cut off water in coal pitJiaozuo coal industry group Fang-Zhuang coal mine;
井下煤层隔水底板注浆堵水加固技术
16.
The problem of no water cut of oil well production for a long time in bottom water reservoir with barrieris is solved.
并结合实例进行了计算,从而解决了带隔板底水油藏油井长期生产而不见水的问题。
17.
Improvement on the water charge process for water scrubber and cooling tower in purification procedure
清净工序水洗塔、冷却塔加水工艺的改进
18.
On Construction Technique of Intake Tower of Water Supply and Power Tunnel in Hengquan Reservoir
横泉水库供水发电洞进水塔施工工艺