说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> Max-NPV项目调度
1.
Study on Bank Credit Limit Based Max-NPV Project Scheduling Problems
基于银行授信额度的Max-NPV项目调度问题研究
2.
Max-npv project scheduling problems with cash flow balance constraints
现金流平衡约束下的Max-npv项目调度
3.
Resource-constrained Max-npv project scheduling problem and branch and bound algorithm
资源约束型Max-npv项目调度问题的分枝定界算法
4.
A Survey of Max-npv Project Scheduling Problems;
Max-npv项目进度问题研究评述
5.
The Project Evaluation Based on NPV and Options;
基于NPV/OPTIONS的项目评价
6.
Analysis of Real Estate Project Investment Based on Extended NPV;
基于扩展NPV的地产项目投资分析
7.
Comparison of NPV and IRR in Investment Projection Evaluation
投资项目评价中NPV与IRR的比较分析
8.
Risk Transmission Relationship between NPV and IRR in Economic Evaluation of Project Management;
项目经济评价中NPV和IRR的风险传递关系研究
9.
The discern method of NPV and IRR influence factor in the post-evaluation;
工程项目后评价中NPV和IRR影响因素识别方法
10.
Risk NPV Method used in Economic Evaluation of Construction Project Invested by Multi-investment Subject;
多投资主体建设项目经济评价中的风险NPV法
11.
Exploration on Experiment Exam Innovation of Project-based Learning of 3D MAX;
3D MAX项目教学中的实验考试改革探讨
12.
extraordinary items and prior year adjustments
非常项目和上年度调整数
13.
An Algorithm for Solving the Resource Constrained Project Scheduling Problem;
资源受限的项目调度问题的求解算法
14.
Analysis of Coordinating Control of Pace-Quality in Construction Project Management;
工程项目进度与质量的协调控制分析
15.
The Research of Real Time Project Based on the Linux Environment;
基于Linux环境的实时调度项目的研究
16.
Study of the Multi-project Scheduling Problem of Flexible Resource Constraint;
柔性资源受限的多项目调度问题研究
17.
A Multi-Pass Biased Random Sampling Method for Scheduling Multiple Projects;
随机抽样算法在多项目调度中的应用
18.
Critical chain -- A new method for project planning and scheduling;
关键链——一种项目计划与调度新方法