说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 龙潭水库
1.
Features of the crustal stress field since the Cenozoic Era in Qingjiang Dalongtan reservoir area
清江大龙潭水库区新生代以来地壳应力场特征
2.
Design and Application of Vibration and Sinking - Mold Plank Wall of Seepage Prevention in Yanglongtan Reservoir;
龙潭水库振动沉模防渗板墙设计与应用
3.
Effection Analyses and Hydro-Fracture Grouting in Bailongtan Soil-Dam;
龙潭水库土坝劈裂灌浆及其效果分析
4.
Application of new grouting technologies for anti-seepage and leakage blocking to Dalongtan Reservoir in Guangxi
广西大龙潭水库防渗堵漏灌浆新技术应用
5.
As a punishment, the Black Water Dragon King is ordered to leave the Dragon King Pool which then becomes Tian 'Chi or Lake of Heaven.
黑水龙王也受玉帝惩罚,搬出龙王潭。 龙王潭,也就成了现在的天池;
6.
Longtan hydropower control project layout and foundation treatment design
龙潭水电站枢纽布置及基础处理设计
7.
Optimization of reservoirs dispatching of Huaguangtan cascade power stations
华光潭梯级水电站水库优化调度探讨
8.
The Numerical Analysis of Slope Stability of Li Yutan Reservoir;
黎雨潭水库边坡稳定性数值分析研究
9.
QC Practice of Laohutan Reservoir Extrusion Side Wall
老虎潭水库挤压边墙新工艺QC实践
10.
Impact of Water Replenishment from Guilin Qingshitan Reservoir on Water Environment of Lijiang River
桂林青狮潭水库补水对漓江水环境的影响
11.
An old man told them that they could find water at the bottom of the Golden Loong an Pond .
有位老人告诉他们只有金龙潭底才能挖出水来。
12.
Impact of Water Replenishment from Guilin Qingshitan Reservoir on Vegetation on Bank Belts of Lijiang River
桂林青狮潭水库补水对漓江岸边带植被的影响
13.
Today the Black Dragon Pool has been made part of a beautiful park bearing the same name.
目前,黑龙潭名胜区已辟为“黑龙潭公园”。
14.
Design and Construction of the Hollow Gravity Dam of Mo-Tze-Tan Reservior
磨子潭水库大体积肋墩坝的设计和施工
15.
Analysis on bank stability of Longbeiwan Reservoir nearby Hongping Town
龙背湾水库洪坪集镇库岸稳定性分析
16.
Study on Distribution of Methane in the Late Permian Coal-bearing Strata in Shuicheng-panxian-Luzhi Region; Guizhou Province, China;
贵州六盘水地区晚二叠世龙潭组煤系地层中瓦斯富集规律的研究
17.
Abrasion resistance design and operation management for dam-bag of rubber dam for Longtan Hydropower Station
龙潭水电站工程橡胶坝袋抗磨损设计与运行管理
18.
The Application of the Glass Fiber Reinforced Plastic Formwork in the Phase 4 Waterborne Terminal of Longtan Port District of Nanjing Port
玻璃钢模板在南京港龙潭港区四期水工码头Ⅱ标段中的应用