1.
Risk Assessment for Subway Projects:Taking Nanjing Subway Line 2 as an Example
地铁工程风险评价——以南京地铁2号线为例
2.
Discussion on Risk Sources of Shield Construction in Nanjing Metro Line 2
结合南京地铁2号线谈盾构施工风险源
3.
Nanjing Metro Line 2 for Structural Safety Monitoring Technology Research Program
南京地铁2号线结构安全监测技术方案的研究
4.
Structural Calculation and Experiment of U-beam in Nanjing Metro Line 2
南京地铁2号线东延高架线路U型梁结构计算及试验
5.
The Research on the Interior Design and Construction of the Nanking Subway No.1 Line;
南京地铁一号线室内设计与施工研究
6.
The Discussion about BT Financing Mode of Nanjing Subway Ⅱ;
浅议南京地铁二号线BT投融资模式
7.
Nanjing Subway Line 1 Passenger Forecasting for the Opening Period
南京市地铁1号线开通初期客流预测
8.
Multiple Fall-back Mode of Signal System at Nanjing Metro Line 2
南京地铁二号线信号系统多级后备控制模式
9.
Analysis on Major Issues of Main Transmission System of Cars for Nanjing Metro Line 1
南京地铁1号线车辆主传动系统问题分析
10.
Localization of Carbon Blocks in Nanjing Metro Line 1
南京地铁1号线电客车轮缘润滑块国产化研究
11.
Application of Passengers' Information System of Nanjing Metro Line 1
旅客资讯系统在南京地铁1号线的应用
12.
Structure and Optimization of the Transmission System of Communication for Nanjing Metro Line 1
南京地铁1号线通信传输系统的构造与优化
13.
The Optimization of Control Program for Cooling Water System in Subway No.1 Lin of Nanjing
南京地铁一号线冷水机组控制程序优化策略
14.
Localization of Filter Element of Air Compressor in EMU of Nanjing Metro Line 1
南京地铁1号线电客车空压机滤芯国产化
15.
urban transport organization scheme in the course of subway construction:A case of No. 2 subway in Nanjing;
城市地铁站点施工期交通组织方案研究——以南京市地铁二号线为例
16.
Study on Scheme of(75+100)m Single Pylon and Cable Plane Cable-Stayed Bridge on Line 2 of Nanjing Metro
南京地铁二号线(75+100)m独塔单索面曲线斜拉桥方案研究
17.
The Beijing Subway Company said they are considering the feasibility of creating woman’s section on the cars running Line 1 and Line 2.
北京市地铁公司表示可考虑在1、2号线的少数车厢试点女性专用。
18.
Failure Analysis and Optimum Solution of The Air-Condition and Ventilation System Equipment in Nanjing Subway Line 1 Duiing Initial Stage of the Operation
南京地铁一号线运营初期空调通风系统设备故障分析及优化方案