1.
Numerical Analysis of Karster Cave Treatment Method for Road Embankment
下覆溶洞路基工程处理方法可行性分析
2.
Construction Technology of Grouting Treatment against Subgrade Karst Holes of Guang-Wu Expressway
广梧高速公路岩溶路基土洞注浆处理施工
3.
Research of Foundation Treatment Technology in Karst Area of Hang-jin-gu Highway;
杭金衢高速公路溶洞发育区地基处理技术研究
4.
Integrated Research for Karst Soil-void (Sinkhole Collapse) Hazard of Linear Engineering;
线性工程路基岩溶土洞(塌陷)灾害防治综合研究
5.
The Applications of the Drilling Grouting Technique in the Construction of Railway Roadbed in Karst Cave
钻孔注浆技术在岩溶洞穴铁路路基工程施工中的应用
6.
Study on Suitability for Soil Cavity Inside the Subgrade in Karst Area for Its Reconnaissance and Measures;
岩溶地区路基土洞勘察方法及处治措施适宜性研究
7.
Study on Effect of Cave and Cave Soil on Building Foundation in Karst Region;
岩溶区溶洞及土洞对建筑地基影响的研究
8.
Study on the Roof Stability of Concealed Karst Cave under Pile Foundation Loading in Karst Areas;
岩溶区桩基荷载下隐伏溶洞顶板稳定性研究
9.
The Stability Analysis of Cavern under the Pile Foundation of Bridge in Karst Area;
岩溶地区大桥桩基下伏溶洞稳定性研究
10.
On limestone cave disposal methods in bridge pile foundation projects
浅谈桥梁桩基施工中的溶洞处理方法
11.
APPLICATION OF GPR TO KARST CAVE DETECTION AT HIGHWAY BRIDGE LOCATION
探地雷达在高速公路桥址溶洞探测中的应用
12.
Study on Comprehensive Geophysical Exploration Methods of Karst Cave Exploration for the Highway
公路岩溶洞穴探测的综合物探方法研究
13.
The term highway includes its highway subgrade pavement, bridges, culverts and tunnels.
公路包括公路的路基、路面、桥梁、涵洞、隧道。
14.
Simulation Analysis of Multi-Factors on the Karst Roof Stability under Pile Foundation;
桩基下溶洞顶板稳定性多因素模拟分析
15.
After the Pile Karst Geological Conditions Pile Bearing Stratum Bedrock Cave Processing
成桩后喀斯特地质桩端持力层基岩溶洞的处理
16.
Influence Research of Limestone Cave on the Construction Stability of Single Track Railroad Tunnel;
既有溶洞对铁路单线隧道施工稳定性的影响研究
17.
The Routing Hole GEAR~+ Algorithm Based on Dijkstra~+ Strategy
一种基于Dijkstra~+策略的路由空洞算法GEAR~+
18.
New method of software vulnerability detection based on fuzzing
一种基于fuzzing技术的漏洞发掘新思路