1.
Application of Double-guide Beam Bridge Erector in Construction of Assembled Bridge
双导梁架桥机在装配式桥梁施工中的应用
2.
Construction Technology for Down Slope Girder Erection on Curved Highway Bridge with Large Gradient by Using 100t 40m Two-Guided Girder Erecting Machine
100t 40m双导梁架桥机大坡度曲线公路桥下坡架梁施工技术
3.
Cost analysis of 24m double track box girders erection by bridging machine;
架桥机架设24m双线箱梁费用分析
4.
Construction sequence and cost analysis of 24m double line box girders erected at tunnel portal by JQX900 bridging machine;
JQX900型导梁式架桥机隧道口架设24m双线整孔箱梁施工工序及成本分析
5.
The Study on 900T-Grade Guide Girder Non-Moving Lifting Bridge Beam Erection Machine;
900吨级导梁式定点起吊架桥机研究
6.
Standards for railway bridge erection by girder erecting machine
铁路架桥机架梁规程
7.
Assembly Program Optimization of Single-beam Bridge Machine under Special Conditions
单导梁架桥机特殊条件下的组装方案优化
8.
hand-operated single-and-double beam bridge crane
手动单双梁桥式起重机
9.
double girder truss gantry crane
双桁架梁龙门起重机
10.
double-beam bridge type grab crane
双架桥式抓斗起重机
11.
Girder Erecting Techniques with JQ900E Bridge Erecting Machine
JQ900E型架桥机架梁施工技术
12.
Railway T-shaped Girder Erecting with Road Bridging Machine
公路架桥机架设铁路大吨位提速T梁
13.
On erecting railway 2201T form by using TJ168 bridge girder erection machine
TJ168型架桥机架设铁路2201型T梁的施工
14.
Mechanics Analysis and Safety Assessment on Defective Beam of 100T/40M Highway Bridge-Eredting Machine;
100T/40M公路架桥机含缺陷导梁受力分析及安全评定
15.
Design of Full Hydraulic Girder Erection Crane for Wuhu Changjiang River Bridge
芜湖长江大桥全液压架梁起重机设计
16.
The Research of the Electrical Control System in the 900 Ton Bridging Machine;
900吨箱梁架桥机电气控制系统的研究
17.
Dynamics Analysis and Numerical Simulation on the Major Girder of JQ900 Crane;
JQ900型架桥机主梁动态分析与数值仿真
18.
On the harmonic response analysis of the power for the main girder of DF50/160 bridge machine
DF50/160架桥机主梁的动力谐响应分析