说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 分部分项工程费
1.
Sub-engineering fee monte-carlo simulation method based on RBF neural network forecast
基于RBF神经网络预测的分部分项工程费蒙特卡罗仿真方法
2.
Analysis to the Countermeasure of Building Item Cost Control;
建筑工程项目成本费用控制对策分析
3.
Analysis of the Optimum Benefit-cost of Highway Engineering Project;
公路工程项目最佳效益-费用分析方法
4.
A Analysis of the Huge Engineering Project s Combined Risk of Schedule and Cost;
大型工程项目进度-费用联合风险分析
5.
How to determine the unit price of the separated parts of a project at submitting and calling for tenders;
谈招投标中分部分项工程单价的产生
6.
Analysis of Time-cost-quality Trade-off in Engineering Project Management;
工程项目管理中工期-费用-质量的权衡分析
7.
Research on the Application of Life-cycle Costing Analysis Method in Construction Project;
工程项目应用全寿命费用分析方法研究
8.
The cost of such a power plant is a relatively small portion of the total cost of the development.
这样一个发电站的修建费用仅占该开发工程总费用的一小部分。
9.
RESEARCH AND PRACTICE ON THE INTERACTION METHOD IN SEAMAN SKILL TRAINING;
水手工艺课程部分项目互动教学探索与实践
10.
Discussion on Bidding Sequence Adjustment of Equipments and Technical Engineering;
设备及专项分部工程招标时序调整的探讨
11.
Application of the interior return rate on economic analysis of construction projects;
工程项目经济分析中内部收益率的应用
12.
For a large part, interacting with software (especially business software) is a pragmatic exercise.
大部分时候,与软件(特别是商业软件)的交互是一项费力的工作。
13.
The Application of Neural Networks on Life Cycle Cost Analysis of Multi-ribbed Wall Structure
密肋壁板结构工程项目全寿命费用分析方法研究
14.
The Project Cost Risk Analysis Based on the Level Assessment and Data-entropy
基于层次评估和熵判数据的工程项目费用风险分析
15.
The programme is divided into three parts. The first part comprises the first three years when construction of housing development is under way.
这项计划分作三部分:在计划的首三年,建屋工程全面进行;
16.
The Impact on the Environment after Requisition of Forestland by Hydropower Construction Projects in Sichuan
四川部分水电工程项目征占用林地后的环境影响分析
17.
Cost Budgeting- allocating the overall cost estimate to individual work items.
费用预算-总费用分配到单个工作项目上。
18.
3 Cost Budgeting-allocating the overall cost estimate to individual work items.
费用预算-将总费用分配到单个工作项目上。