1.
The foundation problems and countermeasures in stationary tower crane foundation construction
固定式塔吊基础施工中地基问题及对策
2.
lifting frame, mobile, on tyres, self-propelled, designed to operate when stationary
轮胎式移动吊架,自动的,为在固定工作而设计的
3.
There are two light fixtures on the ceiling.
屋顶上有两盏固定吊灯。
4.
fasten with or as if with a garter.
用或仿佛用吊带固定。
5.
The accident case of a fixed tower crane and prevention measures
固定式塔式起重机拆卸存在问题及防治措施
6.
Study on the Attachment Mode of Fixed Tower Crane at UHV Transmission Tower Test Base
特高压杆塔试验基地塔吊附着方式研究
7.
Hoisting Technique Used in Changing Inner Barrel of a Blare Stack Supported with Tower Mast
塔桅式烟囱内筒体更换吊装施工技术
8.
Self-made hanging beam dismantling H3/36B tower crane
自制吊梁拆卸H3/36B塔式起重机
9.
Hoisting and Installation of 1000 MW Tower-type Boiler Steel Frame of Ninghai Power Plant
宁海电厂1000MW塔式锅炉钢架吊装
10.
He had to keep his broken arm in a sling.
他不得不把断胳膊固定在吊带上。
11.
Research on Behabiovr of the Combined Tower Cranes Hositing Windgenerators
主副组合式塔机吊装风力发电机工作性能研究
12.
Erection of Ultra-high Voltage Guyed Portal Steel Tower by Large Tonnage Crane Groups
利用大吨位吊车组立特高压自立式门型塔
13.
Optimization of 1000 MW Unit Tower-type Boiler Heating Surface Hoisting Scheme
百万千瓦机组塔式锅炉受热面吊装方案的优化
14.
Comparison and Study of Tensioning Hangers Scheme for Single-pylon Self-anchored Suspension Bridge
独塔自锚式悬索桥吊杆张拉方案比较研究
15.
Calculation of anti-wind capacity for tower crane with hook being anchored in non-use situation
非工作状态吊钩锚定时塔机抗风能力的计算
16.
The components of a suspension bridge are: flexible cables, towers, anchorages, suspenders, deck and stiffening trusses.
悬索桥有下列构件:柔性索缆、索塔、锚固件、吊杆、桥面、加劲桁架。
17.
Modified suspended fixation used in the laparoscopic appendectomy
改良悬吊固定法在腹腔镜阑尾切除术中的应用
18.
The Study on 900T-Grade Guide Girder Non-Moving Lifting Bridge Beam Erection Machine;
900吨级导梁式定点起吊架桥机研究