1.
Study on the cross tunnel beam construction technology of special railway for transporting passengers
铁路客运专线过隧箱梁施工技术研究
2.
Study on construction skill of 900t tunnel-crossing case bridge's erection
900t过隧箱梁架设施工技术研究
3.
The Manufacturing and Usage of Box Beam Flange Slab Casting Form for Special Passenger Line
高速客运专线过隧道箱梁翼缘板补浇筑模架的研制与使用
4.
Construction and Organization of Steel-Box Girder Crossing Expressway Tunnel of Huangpu Highway
跨黄埔大道车行隧道钢箱梁的施工与组织设计
5.
Research and Application of Cantilever Assembly Equipment to Prefabricated Segmental Box Girder of Shanghai Yangtze River Tunnel-Bridge Section B6
上海长江隧桥B6标预制节段箱梁悬臂拼装设备研究与应用
6.
Study on Construction Technology for Pre-fabricated Segmental Box Girder Cantilever Erection in Shanghai Yangtze River Tunnel-Bridge Section B6
上海长江隧桥B6标预制节段箱梁悬臂拼装施工技术研究
7.
The load from the cable is transmitted to the steel box beam by friction between the anchorage plate and the bottom plate.
锚固耳板与钢箱梁腹板间通过摩擦力将斜拉索力传至钢箱梁。
8.
Construction sequence and cost analysis of 24m double line box girders erected at tunnel portal by JQX900 bridging machine;
JQX900型导梁式架桥机隧道口架设24m双线整孔箱梁施工工序及成本分析
9.
Several Linear-Control Questions of Long Span Steel Box Girder in Spelling and Thrusting Case
大跨度桥梁钢箱梁拼接顶推施工过程线形控制的若干问题
10.
The sunlight thermal gradient of the steel box girder and the deformation of the last girder in incremental launching construction of Hangzhou Jiangdong Bridge
杭州江东大桥钢箱梁的日照温度梯度及顶推过程中末段梁的变形
11.
Research on Stiffening Girders Erection and Temporary Connection of Suspension Bridge;
悬索桥钢箱加劲梁安装过程及临时连接的研究
12.
Load Measurement of Shores in the High-Scaffold Formwork System for the Construction of Cast-in-Place Box Girder
现浇箱梁施工过程模板支撑内力实测研究
13.
Monitor Research on 32m Box Girder Transportation and Erection Process of Wu-Guang PDL
武广客运专线32 m箱梁运架过程监测研究
14.
The "box" is a counterweight, used to keep the bridge open when boats are trying to go across it.
这个”箱子”是有秤锤的作用,当船要经过时,能保持桥梁的张开.
15.
HeLong Trestle was constructed by steel tube pile bracket after comparing some schemes.
和龙高架桥现浇箱梁经过方案比较选用钢管桩支架施工。
16.
Study on Nonlinear Whole-working History Analysis of Prestressed Reactive Powder Concrete Box Girder;
预应力活性粉末混凝土箱梁非线性全过程分析研究
17.
The Simulation of the Speedy Construction of Hign-speed Rail Way Large-scale Box Girder on the Soft Soil Foundation;
高速铁路大型箱梁在软土地基上快速施工过程的仿真模拟
18.
Research on the Erection Plan of Steel Box Girder and the Construction Process of Three-Tower Suspension Bridge
三塔悬索桥钢箱梁架设方案研究及施工过程分析