说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 全厂性停电
1.
Several Questions that Should be Noticed in Setting Calculation of 220kV Transformer Protection Device
某小电厂三次全厂性停电事故的分析
2.
Safety and Reliability of Power Supply in Sheet Glass Factory
平板玻璃工厂供电的安全性和可靠性
3.
EVALUATION OF SAFETY AND RELIABILITY FOR EMERGENCY TRIP SYSTEM OF 300 MW UNITS IN THERMAL POWER PLANTS
火电厂300MW机组ETS安全可靠性评估
4.
Due to a slip - up at the power plant, there is a five hours blackout
发电厂的疏忽导致停电五小时
5.
Due to a slip-up at the power plant, there was a five hour blackout.
发电厂的疏忽导致停电五小时。
6.
Refinery (Blue field. Power one down until you have adequate power.
矿厂(蓝矿。先停电直到你有足够电量。)
7.
One suggestion was that the nation observe a minute or two of total blackout.
其中一个提议是搞一个一两分钟的全国性停电。
8.
Production at the factory has come to a complete/full stop.
这家工厂的生产已完全停顿.
9.
General principles of reliability analysis for nuclear power plant safety systems
GB/T9225-1999核电厂安全系统可靠性分析一般原则
10.
Requirements of reliability analysis for nuclear power plant safety systems
GB/T7163-1999核电厂安全系统的可靠性分析要求
11.
The Stress Analysis and Safety Assessment of Pressure Vessels with Flaws in Power Plant;
电厂含缺陷压力容器应力分析及安全性评价
12.
Seismic Safety Evaluation of Sanmenxia Longgou Flyash Dam;
三门峡火电厂龙沟灰坝的地震安全性评价
13.
The Design and Analysis of Security and Reliability Management System of Power Plant;
发电厂安全与可靠性管理系统的设计分析
14.
The Security Influence of the Flushing Pipe for Steam-Water Piping System in Power Station
电厂冲管对汽水管道系统的安全性影响
15.
AN APPROACH TO SAFETY INSPECTION BEFORE ISTALLATION OF BOILERS IN THERMAL POWER PLANTS
火力发电厂锅炉安装前安全性能检验探讨
16.
The Measurements of the Dynamic State Thermal Parameters of HFETR Fuel Element:the Loss-of-Power Accident,the Shutdown Cooling and the Decay Heat Experiment
高通量工程试验堆燃料元件动态热工参数测量——全厂断电、停堆冷却与剩余发热实验
17.
A blackout was out of the question.
更不用说全面停电了。
18.
Criteria for independence of class 1E equipment and circuits in nuclear power plants
GB/T13286-1991核电厂安全级电气设备和电路独立性准则