说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 大坝表孔
1.
Research on Numerical Modeling of Smoothed Particle Hydrodynamics and Simulate Discharge Through Crest Orifice on Dam;
光滑粒子数学模型的研究及对大坝表孔泄流的模拟
2.
Analysis on damage reason of basin plate of stilling pool and reinforcement at Ankang dam
安康大坝表孔消力池底板破坏原因分析及补强加固处理
3.
Design and Construction of 25 m Span Slipform for Surface Discharge Hole of Lower Reservoir of Zhanghewan Pumped Storage Power Station
张河湾蓄能电站下水库大坝表孔25 m跨度拉模设计与施工
4.
Shape Study on Large-discharge Flood-releasing Energy Dissipator for Crest Spillway of Medium and Small-sized Arch Dam
中小型拱坝表孔大流量泄洪消能建筑物体形研究
5.
A Study on Stress Influence of the Large Orifice on the Masonry Arch Dam;
大尺寸泄洪孔对浆砌石拱坝坝体应力影响研究
6.
Optimal experimental study on flaring piers of surface spillways in high arch dam
高拱坝表孔宽尾墩体型优化试验研究
7.
Surface Cracks Problem of Spillway Dam in Fengman Projects;
丰满大坝溢流坝段表面裂缝问题研究
8.
Model test for dam bottom flushing outlet of DAPEIN(Ⅰ) Hydropower project
DAPEIN(Ⅰ)水电工程大坝冲砂底孔体型试验
9.
STUDY ON H_2S GAS FEATUREIN THE WATER AND SIGNIFICANCE OF THE SAFE OPERATION OF TONGJIEZI HYDROPOWER STATION DAM
铜街子大坝排水孔水中H_2S气体特征研究及大坝安全运行意义
10.
Experimental Investigation on Energy Dissipation by Flaring Gate Piers on Spillways and Slit-Type Bucket on Bottom Level Outlets in High Arch Dams;
高拱坝表孔宽尾墩—深孔窄缝挑坎联合消能试验研究
11.
Observation Data Analysis of Hole Stress in a Dome Dam
欧阳海双曲拱坝大孔口应力观测成果分析
12.
Experimental Study on Energy Dissipation of Flood Discharge for Upper Hole of Double-curvature Arch Dam of Donghe Reservoir
洞河水库双曲拱坝表孔泄洪消能问题的试验研究
13.
Pre-stressed Anchorage Project Construction Technology for Middle Orifices Dam Section of Project in Upstream Surface of Yunfeng Hydropower Station Dam
云峰水电站大坝上游面加固工程中孔坝段预应力锚索工程施工工艺
14.
Calculation of Unsteady Temperature Field and Temperture Stress Around Conduit in Concrete Dam by Finit Element Method
用有限元法计算大坝底孔的非稳定温度场和温度应力
15.
Model Test on Drop Slit-Bucket of the Middle Outlet Works in Arch Dam for Dahuashui Hydropower Station;
大花水水电站拱坝中孔跌坎窄缝消能工试验研究
16.
Application of deep-hole differential crush blasting in excavating the spillway of Kesem Reservoir
深孔微差挤压爆破在Kesem大坝溢洪道开挖中的应用
17.
Design and Installation Technique of Water Observation Well in Geotechnical Investigations for Hydropower Projects in Sudan
苏丹大坝勘察中地下水水位观测孔的设计及安装工艺
18.
Application of sealed orifice grouting in seepage elimination project at Fengman dam
孔口封闭灌浆法在丰满大坝降渗工程帷幕灌浆中的应用