说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 变截面连续箱梁桥
1.
Finite Element Analysis of Skewly-Supported Continuous Box Girder Bridge with Variable Section;
斜交变截面连续箱梁桥的有限单元法
2.
STUDY ON CALCULATION OF THE ECCENTRIC-LOADED COEFFICIENTS OF THE VARIABLE CROSS-SECTION CONTINUOUS CONCRETE BOX-BEAM
变截面连续箱梁桥偏载增大系数的计算研究
3.
ANALYSIS OF CURVED CONTINUOUS BOX-GIRDER BRIDGES WITH VARIOUS PLATE THICKNESS BY DOUBLE SPLINE SUBDOMAIN METHOD
双样条子域法分析变截面连续弯箱梁桥
4.
STATIC ANALYSIS OF STRAIGHT BOX GIRDER BRIDGES BY SPLINE SUBDOMAIN METHOD
双样条子域法分析等高度变截面连续直箱梁桥
5.
Shear Lag Effect Analysis in Box Girder of a Continuous Rigid-Frame Bridge with Varying Depth;
连续刚构桥变截面箱梁剪力滞效应分析
6.
On construction technology of suspending irrigated variable cross-section prestressed continuous box-girder bridge
悬浇变截面预应力混凝土连续箱梁桥施工技术
7.
Analysis for Prestressing of Curved Continuous Box Girder Bridges
箱型截面曲线连续梁桥的预应力分析
8.
Theoretic Analysis and Experimental Research about Shear Lag Effect of Variable Cross-section Continuous Box Girder Bridge;
变截面混凝土连续箱梁桥剪力滞效应理论分析与试验研究
9.
Transverse load distribution on box section continuous composite steel-concrete bridges
箱形截面连续组合梁桥的荷载横向分布
10.
The cantilever construction technique of variable cross-section prestressed concrete continuou box-girder
变截面预应力混凝土连续箱梁的悬臂施工技术
11.
Vibration Analysis of Multi-span Continuous Beam Bridges with Non-uniform Cross Section Under Moving Vehicles
多跨变截面连续梁桥在车辆通过时的振动分析
12.
Calculating distortion geometric nature of arbitrary section in continuous box beam is an important link in calculating the internal force and stress of all cross sections divided.
任意截面箱形连续梁畸变几何性质计算是箱形连续梁的内力和应力计算的重要环节。
13.
The paper gives the recount for the method and function of calculating distortion geometric nature of arbitrarily section in continuous box beam.
叙述任意截面箱形连续梁畸变几何性质的计算方法和作用。
14.
Development of CAD System for Single Section Continuous Beam of Middle-Small Span;
中小跨径等截面连续箱梁CAD系统的开发研究
15.
Cantilever casting construction of large-span and large-cross-section continuous box girder of passenger-dedicated line
客运专线大跨度大截面连续箱梁悬臂浇筑施工
16.
Construction Technique of Continuously Changing Hight Prestressed Concrete Beam 0 #;
变截面预应力砼连续梁0#块的施工
17.
Wheel Load of Bridge Deck of Large-Span Continuous Composite Box Girder
大跨连续组合箱梁桥面板轮载作用分析
18.
Study on the Bending and Torsion Deformation of Continuous Prestressed Concrete Curved Box-Girder;
预应力混凝土连续弯箱梁桥弯扭变形的研究