1.
Filling construction technology and method for gravel soil core of Nuozhadu Rock-fill Dam with Core
糯扎渡大坝心墙掺砾土料填筑施工工艺及方法
2.
Application of acoustic wave test in excavation of dam foundation of Nuozadu Hydropower Station
声波测试在糯扎渡大坝基础开挖中的应用
3.
Experimental blasting quarrying of construction material for zone Ⅰ of dam of Nuozhadu Hydropwer Station
糯扎渡水电站大坝Ⅰ区料开采爆破试验
4.
Core Rock-fill Dam Construct-Planning Introduction of Nuozhadu Hydropower Station
糯扎渡水电站心墙堆石坝施工规划简介
5.
Research on Balancing Earth-Rock Works Allocation of Nuozhadu Core Rockfill Dam
糯扎渡心墙堆石坝土石方调配平衡研究
6.
Study on Eearth-rock Transportation and Dam Filling Schedule of High Core Rock Fill Dam for Nuozhadu Hydropower Station;
糯扎渡水电站心墙堆石坝土石方调运及坝体填筑进度分析
7.
The back-analysis of deformation parameters of core gravelly soil of the Nuozhadu high rock-fill dam
糯扎渡高心墙堆石坝心墙砾石土料变形参数反演分析
8.
Research on Formation Mechanism of Deeper Rip in Slope at the Dam of Nuozadu Hydro-electrical Power Station;
澜沧江糯扎渡水电站坝区斜坡深部拉裂的形成机制研究
9.
2-Dimensional Vertical Water Temperature and Water Quality Numerical Simulation on Large Reservoir--Take Nuozhadu Reservoir as an Example;
大型水库纵竖向二维水温、水质数值模拟——以糯扎渡水库为例
10.
3D Optimization Analysis of Excavation and Support for Underground Powerhouse at Nuozhadu Power Plant;
糯扎渡大型地下厂房开挖施工顺序和锚固参数的优化分析研究
11.
Study on the Stability of Spillway High Steep Man-Made Slope of Nuozadu Hydroelectric Power Station in Lancang River;
澜沧江糯扎渡水电站大型溢洪道高陡工程边坡稳定性研究
12.
The influence of building large hydroelective power station in Nuozadu district, Lancang County on the local minority;
澜沧县糯扎渡乡境内建设大型水电站给当地少数民族带来的影响
13.
The Engineering Properties and Slop Project Protective Measures of Full、Strong Weathered Granite in Nuozadu Hydro-power Station Dam Area;
糯扎渡水电站坝址区全、强风化花岗岩工程特性及工程边坡防护措施
14.
Heat Transfer Analysis of Tunnel Ventilaton-Theoretical and Numerical Study of Heat Transfer in Underground Tunnel of Jing-hong and Nuo-zha-du Hydropower Station;
廊道通风换热过程分析—景洪、糯扎渡水电站坝体廊道通风理论与数值模拟研究
15.
Studies on Nuozhadu Reservoir Area Migration Project and Community Integration
糯扎渡库区移民工程与社区整合研究
16.
Construction ventilation for power tunnel system of Nozhadu Hydropower Station
糯扎渡水电站引水发电系统施工通风
17.
Conductor Schemes for ±800 kV UHVDC Transmission Line of Nuozhadu-Guangdong
糯扎渡-广东±800kV直流输电线路导线选型
18.
Analysis of seepage field for underground power house of Nuozhadu Hydropower Station
糯扎渡水电站地下厂房区渗流场分析