1.
Research on the Project Progress Management about Electrical Equipment Installment and Debugging of Transformer Substation
变电站电气设备安装调试项目进度管理研究
2.
Pre-failure Diagnosis of Substation Electrical Equipment under Icing Condition and Preventive Techniques
变电站电气设备冰灾超前诊断与防范技术研究
3.
Researches on Electric Equipments Insulation Online-monitoring System of Chong Qing Da Zhu Ling 220kV Substation;
重庆大竹林220kV变电站电气设备绝缘在线监测系统研究
4.
It will danger electric equipment in substations.
它将对变电站中的电气设备造成危害。
5.
electric plant control panel
电站控制板电气设备控制板
6.
Research on Choice of Electrical Equipment of 110 kV in Hydroelectric Power Station;
水电站110kV电气设备选择技术研究
7.
The systembased on operating rules and actual state of electric equipment of substation can be applied to several substations andgive correct operation order.
该系统能根据变电站操作规则和电气设备的实际状态,同时面对多个变电站,开列正确的操作票。
8.
Superficial Discussion on Design of Electrical Secondary Architecture of Digital Substation
浅谈数字化变电站电气二次架构设计
9.
Substation Intelligent Communications of Electronic Equipment and Man-machine Interaction Design;
变电站智能电子设备通信和人机交互设计
10.
installation of mechanical and electric equipment of hydroelectric power station
水电站机电设备安装
11.
Research on Electromagnetic Interference Filters of Secondary Equipments in Substations;
变电站二次设备抗干扰滤波器的研究
12.
Notion for Fulfilment of the Contracts of Import Equipment of 500 kV Substation;
500kV变电站进口设备合同履行的要点
13.
Seismic Failure Analysis on Substation Switch Equipments in Wenchuan Earthquake
汶川地震中变电站开关设备破坏机理
14.
Application of remote control for protection equipment in 500kV substations
500kV变电站保护设备远方遥控应用
15.
Discussion about Databank Verification for Substation Automation Equipment
变电站自动化设备对点调试方法探讨
16.
Remote Control Application of Protective Devices in the 500 kV Substation
500kV变电站保护设备的远程控制应用
17.
Disscussion on Implementation of LCC Tender of Substation Equipment
变电站设备实行LCC招标管理的研讨
18.
Probe into Secondary Equipment Integrated Lighting Prevertion in Substation & Application
变电站二次设备防雷技术探讨及应用