1.
The Fast Detective Technology of Shallow Buried Large Span Multi-arch Tunnel Constrution
浅埋大跨径连拱隧道施工快速检测技术
2.
The Preventive Disease Test and Surrounding Rock Instability Research of Shallow Buried Large Span Multi-arch Tunnel;
浅埋大跨径连拱隧道预防性病害检测与围岩稳定性评价
3.
Cause analysis of collapse of large span shallow tunnel in coal series strata
大跨径浅埋煤系地层中隧道塌方事故原因分析
4.
Three-D Mechanical Effect Analysis of Heavy Load over Shallow Buried Large Span Multi-arch Tunnel in Construction Process;
浅埋重载大跨径连拱隧道施工过程空间力学效应分析
5.
The Construction Techniques Study on Large-span Box Tunnel by Shallow Excavation;
浅埋暗挖大跨箱型隧道施工技术研究
6.
Construction technology of the ultra-shallow large span and subsurface excavation subway station
超浅埋大跨暗挖地铁车站的施工技术
7.
On the Application of the Method of Undercutting with Shallow Overburden to Long-spanned Tunnels
浅埋暗挖法在大跨隧道中的应用探讨
8.
STUDY ON BLASTING METHOD OF EXCAVATION OF TUNNEL WITH VARIETY TERRANE THROUGH BIG-SPAN THIN-DOVER
大跨度超浅埋复杂岩层隧道爆破开挖方案研究
9.
Construction Technology of Shallow Buried Wide Span Tunnel Adjacent to Building in Loose Ground Containing Water
松散含水地层邻楼房大跨浅埋洞室施工技术
10.
Study on the Ground Surface Settlement of Large-span Metro Tunnel with Shallow-buried Tunneling Method;
浅埋暗挖大跨度地铁隧道地表沉降分析
11.
Study on Construction Mechanics Effect of Shallow-buried City Light Rail Station Tunnel with Large Span;
大跨浅埋城市轻轨车站隧道施工力学效应研究
12.
Study on Construction Technique of Long Span Tunnel under Shallow and Weak Surrounding Rock;
浅埋软弱围岩大跨隧道的施工技术研究
13.
Monitoring Study on Blasting Vibration by Excavation of Large Cross-Section Shallow Urban Tunnel Constructed in Hard Rock Mass
城市浅埋硬岩大跨隧道开挖爆破振动监控研究
14.
Study on Advancing Support Effect of Shallow and Large Span Tunnel Construction
浅埋大跨度隧道施工超前支护效应研究
15.
Study on Primary Support Effect of Large Span Tunnel under Shallow and Weak Surrounding Rock
浅埋软岩大跨度隧道初期支护效应研究
16.
Shallow buried excavation construction skill of large span tunnel with flat top and straight wall
平顶直墙大跨度隧道浅埋暗挖施工技术
17.
Deformation Monitoring and Its Control in a Shallow-buried Large-span Tunnel Constructed Using the Pile-Beam-Arch Method
浅埋大跨洞桩隧道变形监测与控制分析
18.
Analysis of influence of dismantling temporary supports on preliminary lining of large-span shallow tunnel
浅埋大跨度隧道拆撑对初支安全性影响分析